Close

RMT completes wind turbine installation for KWP II Wind project in US

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

RMT has completed turbine installation and energized the electrical system for First Wind’s 21MW KWP II Wind project in Maui, Hawaii, US.

Construction on the project began in 2011, where RMT is responsible for providing engineering, procurement, and construction of the civil and electrical infrastructure, including the deployment of 14 units of GE SE 1.5MW wind turbine.

It is also responsible for tower erection, operations and maintenance building remodel, SCADA system, and storm water management design. The civil infrastructure includes roads, crane paths and pads, and turbine foundations, while the electrical infrastructure includes a 34.5/69kV substation, 34.5kV electrical collection system, and interconnection to the 69kV Maui Electric Company transmission line.

KWP II is an expansion of the existing 30MW Kaheawa Wind and it will have a combined capacity of 51MW; it is expected to be completed in early 2012.

 

Latest stories

Related stories

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back