ACHEMA MIDDLE EAST

Wind Energy

GE Renewable Energy receives official planning approval for its Teesside blade manufacturing plant

GE Renewable Energy announced that it has received the official planning approval for its Teesside offshore wind blade manufacturing plant from the Local Planning Authorities. This is the first major milestone in the lead up to the construction of...

Siemens Gamesa inaugurates new offshore nacelle assembly facility

Siemens Gamesa Renewable Energy again pioneers the Taiwanese offshore wind power industry by officially inaugurating its new offshore facility in Taichung. This is the company’s first offshore nacelle assembly facility outside of Europe. The ceremony was attended together by...

Sulzer Schmid and ENERTRAG Betrieb improve wind turbine blade inspections with new drone-based lightning protection system testing solution

Sulzer Schmid, and ENERTRAG Betrieb have teamed up to provide a new wind turbine blade inspection solution that integrates ENERTRAG Betrieb’s innovative lightning protection systems (LPS) testing solution with Sulzer Schmid’s UAV technology and digital inspection platform. This key...

RES, ZX Lidars and KK Wind Solutions develop product to upgrade performance of existing wind farms

RES, the world’s leading renewable energy company, alongside ZX Lidars and KK Wind Solutions, has developed a Retrofit Lidar Assisted wind farm Control System (ReLACS) which will improve the performance of existing wind farms.   The product will be trialled...

Siemens Gamesa pioneers wind circularity: launch of world’s first recyclable wind turbine blade for commercial use offshore

Wind power is one of the cornerstones in the quest to tackle the climate emergency. With more than 200 GW of new offshore capacity projected by the Global Wind Energy Council to be installed by 2030, it is critical...

Shell considering the development of a floating offshore wind farm in South Korea

A joint venture has been officially established centered on the development of a large floating offshore wind farm off the coast of South Korea. The major oil and gas shells hold an 80% stake in a JV called MunmuBaram, with...

Orsted signs monopile foundation contracts for offshore wind projects

Ørsted has signed strategic volume contracts with Bladt Industries and Steelwind Nordenham who will be supplying monopile foundations for Ørsted’s German offshore wind farms Gode Wind 3 (242 MW) and Borkum Riffgrund 3 (900 MW). Photo from Borkum Riffgrund...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Must read

Translate »