Events Date: 9

sPower shelves 200-MW wind project in Ohio indefinitely

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Envision Energy and Menderes Tekstil Forge Strategic Alliance for 120MW Turkish Wind Project

Envision Energy, a global green technology leader, has entered...

Belgium and the Netherlands Strengthen Ties Through Nuclear Energy Cooperation

In a significant step for regional energy policy, Belgium...

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...
- Advertisement -

Solar and wind power producer sPower has put on hold its 200-MW Seneca Wind project in Ohio for an indefinite time. sPower has decided not to seek a siting permit application for the project with the Ohio Power Siting Board (OPSB) at this point of time, diverting funds intended for it to other projects. โ€œWe hope to do more work in Ohio in the future, but at this time, we are making the difficult choice to place our resources in other states where there is a greater potential for success,โ€ said CEO Ryan Creamer.

The Salt Lake City-based firm initially filed its siting board application in 2018 but later announced it is withdrawing it due to a filing error. After acknowledging the mistake in the Determination of No Hazard permit by the Federal Aviation Administration, requiring the government agency to cancel the permit, sPower then said it would need to resubmit the OPSB application.

The Seneca wind farm was planned to be located on privately leased land in several townships across Seneca County. With up to 77 turbines in the 2 MW-3 MW capacity range, the power plant would have been able to generate enough electricity to meet the demand of almost 60,000 homes per year, if built.

Power Info Today brings together the global energy industry โ€” from generation and transmission operators to utility executives and energy transition leaders โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

Envision Energy and Menderes Tekstil Forge Strategic Alliance for 120MW Turkish Wind Project

Envision Energy, a global green technology leader, has entered...

Belgium and the Netherlands Strengthen Ties Through Nuclear Energy Cooperation

In a significant step for regional energy policy, Belgium...

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป