ACHEMA MIDDLE EAST

US nuclear regulator begins inspection at Columbia Generating Station

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

UKAEA Launches Simulator for Tritium Fuel Cycle Training

The UK Atomic Energy Authority (UKAEA) is building on...

Cameco, Brookfield Signs Nuclear Reactor Deal with US Govt

Cameco Corporation announced that it has signed a binding...

Canada Government Announces CAD 3B Funding for SMR Projects

Two Canadian government agencies will together invest CAD3 billion...

Google DeepMind and CFS Partners on Fusion Energy Research

Google DeepMind has joined forces with Commonwealth Fusion Systems...

The US Nuclear Regulatory Commission (NRC) has undertaken a special inspection at the Columbia Generating Station to investigate a problem with a piece of equipment that provides cool air to a room, which houses emergency electrical equipment.

Energy Northwest operates the plant situated near Richland, Wash. An inspection conducted recently by the licensee revealed a large heat exchanger that provides cool air for a room housing electrical circuit breakers and safety-related batteries was not maintained properly, minimizing its capability.

A redundant system could have provided cooling and workers would have responded to address maintenance issues in the event of an emergency, said the NRC.

NRC Region IV Administrator Arthur T. Howell said, “The purpose of this special inspection is to better understand the sequence of events that contributed to the maintenance problem and review the licensee’s corrective actions to ensure this cooling system will perform as intended.”

A week will be spent by NRC inspectors onsite to evaluate the licensee’s root cause analysis and corrective actions, following which an inspection report detailing the team’s findings would be made available for the public within 1 ½ months of the inspection.

 

Latest stories

Related stories

UKAEA Launches Simulator for Tritium Fuel Cycle Training

The UK Atomic Energy Authority (UKAEA) is building on...

Cameco, Brookfield Signs Nuclear Reactor Deal with US Govt

Cameco Corporation announced that it has signed a binding...

Canada Government Announces CAD 3B Funding for SMR Projects

Two Canadian government agencies will together invest CAD3 billion...

Google DeepMind and CFS Partners on Fusion Energy Research

Google DeepMind has joined forces with Commonwealth Fusion Systems...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »