Achema middle east

Siemens awarded long-term service agreement for Canadian cogeneration project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Masdar, TotalEnergies Sign $2.2bn Renewable JV Deal in Asia

A $2.2bn agreement between Masdar and TotalEnergies has formalised...
- Advertisement -

Siemens has received an order from Inter Pipeline Ltd (“Inter Pipeline”) to provide long-term service for two SGT-800 gas turbine generator sets in Canada.

The units are scheduled for operation at the Central Utilities Block (CUB), part of the company’s Heartland Petrochemical Complex currently under construction in Alberta’s Industrial Heartland near Fort Saskatchewan.

The 25-year service and maintenance agreement includes scheduled maintenance for the two SGT-800 gas turbine generator sets and associated auxiliaries. Siemens’ remote diagnostics services, part of the company’s “Digital Services for Energy” portfolio, are included and are designed to predict and prevent issues before they impact turbine operations.

The gas turbine generator sets will be a critical part of the CUB, supplying power and steam to the propane dehydrogenation and polypropylene facilities within the Heartland Complex. This facility will use propane to produce polypropylene, a valuable and recyclable plastic used in consumer products. Commercial operation of the CUB is expected in late 2021.

“This 25-year agreement is a testament to the quality and expertise of our SGT-800 service operations and solutions-based digital offerings,” said Thorbjoern Fors, CEO, Siemens Power Generation Services, Distributed Generation and Oil & Gas. “We look forward to working with Inter Pipeline to help ensure the long-term reliability, availability and performance of their SGT-800 units for years to come.”

Latest stories

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Masdar, TotalEnergies Sign $2.2bn Renewable JV Deal in Asia

A $2.2bn agreement between Masdar and TotalEnergies has formalised...

South Asia Clean Energy Transition Gains Regional Momentum

South Asia is undergoing a systemic transformation of its...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »