Achema middle east

Togo launches West Africa’s largest solar plant

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

HELIUP Raises €16M for Lightweight Photovoltaic Panels

HELIUP raises €16 million to accelerate the industrialization of...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...
- Advertisement -

Togo has inaugurated the largest solar plant in West Africa, in a push to increase access to electricity and develop renewables in the small coastal country.

The 50 megawatt facility, located in central Togo, will provide power to more than 158,000 households and save more than one million tonnes of CO2 emissions, Togo’s President Faure Gnassingbe said on Twitter late Tuesday.

“This project is the fruit of our ambition to bring universal access to electricity and provide clean and renewable energy to all.”

“I am thrilled it was done in record time” (18 months), he added.

The plant was built in Blitta, 267 kilometres (165 miles) north of the capital Lome, by AMEA Togo Solar, a subsidiary of Dubai-based AMEA Power.

It hosts 127,344 solar panels expected to produce 90.255 megawatt hours (MWh) of power per year.

Named after the crown prince of Abu Dhabi, Sheikh Mohammed bin Zayed, the project received more than 35 billion CFA francs ($63.7 million) in loans from the West African Development Bank and the Abu Dhabi Fund for Development.

Capacity for an additional 20 MW is scheduled to be built on the same site by the end of the year.

AMEA Togo Solar will be able to exploit the plant for 25 years.

Togo, which imports more than half of its energy from Nigeria and Ghana, is banking on solar power to develop access to electricity for its eight million residents.

Latest stories

Related stories

HELIUP Raises €16M for Lightweight Photovoltaic Panels

HELIUP raises €16 million to accelerate the industrialization of...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...

Banpu US Expansion Drives $1.5bn Push into Gas Power Market

Thai energy group Banpu is preparing a significant expansion...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »