Achema middle east

E.ON seeks federal approval for 700MW wind project in UK

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...
- Advertisement -

UK-based power company E.ON is seeking the approval from the Planning Inspectorate for its 700MW Rampion Offshore Wind Farm in Sussex coast.

The State Secretary has agreed to review the £2bn project after it made significant changes in the project model.

Questions were raised citing environmental impacts including visual impact of the wind farm from the Sussex Heritage Coast, the impact on fishermen and sea users and the impact of the onshore cable route on the South Downs National Park.

For this, the company has reduced the project area by one-fourth and reduced the number of turbines by 20. The new models proposed will feature turbines between 100 and 175.

Commenting on the developments, E.ON project development manager Chris Tomlinson noted that the application consideration by inspectorate is a major milestone for the company.

“In finalising our proposals, we’ve been very grateful for the level of interest shown by the local community and the comments we have received.

“The feedback from the consultations has helped us shape the proposals and further reduce the impact on the local community, while maintaining a project capable of generating electricity for the needs of two thirds of the homes in Sussex,” explained Tomlinson.

E.ON expects the final decision to be made in summer 2014. However, it has scheduled the commissioning in the year 2017.

The energy produced from the project can meet the power needs of 450,000 homes in the region.

 

 

Latest stories

Related stories

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Masdar, TotalEnergies Sign $2.2bn Renewable JV Deal in Asia

A $2.2bn agreement between Masdar and TotalEnergies has formalised...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »