ACHEMA MIDDLE EAST

Nabrawind to bring self-erecting towers to Namibian wind project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

EU Unlocks €2.9B in Funding for Net-Zero Technology Projects

The European Commission has unveiled €2.9 billion in funding...

Baltic Sea Hydrogen Collector Project Receives €15.3M Grant from EU

The European Union has extended financial backing to the...

Topsoe Opens Europe’s Largest SOEC Manufacturing Facility

Topsoe has opened its first Solid Oxide Electrolyzer Cell...

Spanish wind technology company Nabrawind SL will design and supply four self-erecting turbine towers for a wind project in Namibia. The project has been developed by Franco-Namibian company InnoSun Energy, part of French independent renewables company Innovent.

Nabrawind’s solution consists of a rock anchored tower with the Nabralift transition piece as the foundation. The Nabralift tower employs a self-erecting system that lifts the standard tubular tower section with the nacelle and the rotor by adding frame modules below them. The frame modules are connected to the transition piece, which will have three points directly anchored to the rock subsoil to distribute the load. With this structure, the concrete requirements of the project are reduced by 95%, saving around 1,000 tonnes of CO2 emissions, according to Nabrawind.

The tower design is a cost-competitive alternative for wind projects built in places where securing enough concrete may be a challenge, the Spanish firm added.

Construction is due to start in the second half of 2020. The Namibian project will be the second collaboration between Innovent and Nabrawind. The French firm last year ordered a Nabralift tower for a wind project in Morocco.

Latest stories

Related stories

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

EU Unlocks €2.9B in Funding for Net-Zero Technology Projects

The European Commission has unveiled €2.9 billion in funding...

Baltic Sea Hydrogen Collector Project Receives €15.3M Grant from EU

The European Union has extended financial backing to the...

Topsoe Opens Europe’s Largest SOEC Manufacturing Facility

Topsoe has opened its first Solid Oxide Electrolyzer Cell...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »