AqualisBraemar to Oversee Construction of Offshore Wind Vessels in China

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Green Hydrogen Projects in Brazil Get Major Push By H2Brazil

In a recent move, H2Brazil would be investing over...

Cross-Border Hydrogen Connection on Rhine Gets EU Support

In a recent move, the EU commission happens to...

Hydrogen Investment Surges as Global Energy Spends Grow

When we talk of the global energy spectrum, we...

Rio Grande LNG Work Worth $9 Bn Awarded to Bechtel

A news release from the Houston-based oil and gas...

The jack-up units will be constructed at Chinese shipyard Dayang Offshore Equipment. The vessels will be built for OuYang Offshore Co., Ltd.

“Having previously supervised the construction of the OuYang 001 and OuYang 002 wind turbine installation vessels, it is a huge vote of confidence to be engaged for OuYang 003 and OuYang 004 too,” says Yongfei Peng, China Country Manager for AqualisBraemar.

AqualisBraemar’s on-site team at Jiangsu-based Dayang Offshore Equipment will monitor and supervise the construction of the two wind turbine installation vessels – OuYang 003 and OuYang 004 – to ensure that all work is carried out in accordance with the contract specifications plus flag and class requirements.

The project will be managed from AqualisBraemar’s office in Shanghai, China, which previously held the same role for OuYang 001 and OuYang 002. AqualisBraemar has not disclosed the value of the new contract.

“As these are the third and fourth wind turbine installation vessels we are cooperating with OuYang Offshore and Dayang Offshore Equipment on, our joint objective is to deliver a safe and even more cost-effective construction process for the two new vessels,” adds Yongfei Peng.

Both units are identical, 75.6 meters in length, 40 meters in beam, 7 meters in depth, 4 hydraulic pin legs self-elevating wind turbine installation vessels. They are self-propelled, with an operational water depth of up to 50 meters and accommodation for up to 68 persons.

The jack-ups are equipped with one 600MT leg fitted crane around one of stern legs, with a lifting height of 140 meters from sea level. The vessels will be capable of the installation of 10MW wind turbines in China.

Latest stories

Related stories

Green Hydrogen Projects in Brazil Get Major Push By H2Brazil

In a recent move, H2Brazil would be investing over...

Cross-Border Hydrogen Connection on Rhine Gets EU Support

In a recent move, the EU commission happens to...

Hydrogen Investment Surges as Global Energy Spends Grow

When we talk of the global energy spectrum, we...

Rio Grande LNG Work Worth $9 Bn Awarded to Bechtel

A news release from the Houston-based oil and gas...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back