Events Date: 9

Construction of First Kazakhstan Nuclear Power Plant Begins

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...
- Advertisement -

Kazakhstan has formally launched construction of its inaugural nuclear power plant, marking a crucial milestone in the nationโ€™s energy development.

In the Almaty region, the inauguration ceremony included the symbolic laying of a capsule and the start of engineering surveys.

Addressing the gathering, Almasadam Satkaliyev, Chairman of the Atomic Energy Agency, highlighted the projectโ€™s broad strategic scope. โ€œThe implementation of the project will allow Kazakhstan to form a new generation of highly qualified specialists, strengthen its research base, and create conditions for educational and technological breakthroughs,โ€ he said.

Satkaliyev described the Kazakhstan nuclear power plant as a โ€œstrategic projectโ€ capable of advancing the countryโ€™s nuclear sector, enhancing regional infrastructure, and supporting sustainable economic growth. The investment is estimated to be between $14 – $15 billion, with an additional $1 billion allocated to social initiatives.

The first stage began on August 8 near the village of Ulken, where technical teams initiated site surveys and drilling operations. Head of Russiaโ€™s state nuclear corporation Rosatom, Alexey Likhachev, attended the launch alongside Satkaliyev.

Specialists from Rosatomโ€™s engineering arm have started drilling the first exploratory well and gathering soil samples. The collected data will help assess seismic stability, hydrogeological conditions, and additional environmental factors critical to guaranteeing the plantโ€™s safety and reliability.

In total, around 50 wells will be drilled at depths from 30 to 120 metres, with the findings guiding the final selection of the plantโ€™s location.ย 

Three potential sites in the Zhambyl district of the Almaty region are currently under assessment. Rosatom subsidiary JSC Atomenergoproekt will lead the engineering operations, supported by Kazakhstani institutions. These surveys will analyse geological, seismic, hydrological, and climatic factors, including seasonal groundwater fluctuations and potential flood hazards.

Under the bilateral โ€œroad mapโ€ agreement between Kazakhstan and Russia, Rosatom will construct two VVER-1200 nuclear reactors. The construction of the Kazakhstan nuclear power plant is expected to take approximately 11 years, with commissioning planned between 2035 and 2036. Among the various financing options, involvement of Russian state export credit is being considered.

Kazakhstanโ€™s decision to advance nuclear power is driven by the continuing challenges of meeting the nationโ€™s expanding energy demands. The move received public backing in a nationwideย referendumย on October 6, 2024, when over 70 percent of voters approved the nuclear power plant project.

As the worldโ€™s largest producer of uranium, holding about 12 percent of global recoverable reserves, Kazakhstan has not utilised this resource for electricity generation in decades. Between 1973 and 1999, it operated a plant that supplied both power and desalinated water, a facility later decommissioned to comply with the countryโ€™s non-proliferation commitments. With its vast uranium reserves and a renewed emphasis on clean energy, Kazakhstan is now positioned to re-establish its role in the global nuclear sector with a modern, forward-looking approach.

Never miss a energy headline

The energy sector moves fast โ€“ stay on top of it with our must - read briefings.

  • The top power and energy stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping the global power and energy landscape

Latest stories

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...

UK Offshore Wind Strategy Pushes for 5 GW Annual Capacity

The United Kingdom must commission a minimum of 5...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป