Close
MCE 2026
World Hydrogen & Carbon Americas

Cerrejon declares force majeure on coal cargoes as Colombian mine strike continues

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

UK Switches On First Commercial Deep Geothermal Power Plant

The UK’s first deep geothermal power plant has begun...

DOE Unveils $171.5M Push for Next-Gen Geothermal Field Tests

The U.S. Department of Energy (DOE) has announced a...

Thermal Energy Storage Strengthens Power System Planning

The integration of thermal energy storage into power system planning is providing a critical buffer for the electrical grid, enabling long-duration storage and enhancing the overall resilience and reliability of modern infrastructure.
- Advertisement -

Colombian coal major Cerrejon has declared force majeure on some of its cargoes due to the continued strike at the mine.

Beginning 7 February 2013, the strike has left 10 coal vessels waiting for loading affecting supplies to European and North American customers, said Coal Marketing Company (CMC) – the exclusive marketer of thermal steam coal from the Cerrejón mining complex.

Cerrejon is a joint venture between global mining firms Anglo American, BHP Billiton and Xstrata, and accounts for 36 of all Columbian coal production totaling 32 million tonnes per annum.

Force majeure on nearly 600,000t of coal will help the company suspend contractual obligations in the face of the unexpected and long drawn strike.

CMC chief executive Howard Gatiss told Reuters that it was the mine’s first strike since 1990.

“Force majeure has been declared on at least some of these vessels. As long as the strike continues we are unable to comply with our obligations to customers,” Gatiss said.

“No-one knows how long the strike will continue and we are in discussion to reschedule shipments.”

Gatiss added that preliminary talks between unions and management had been stalled for a few days now, delaying attempts to negotiate wages and benefits.

 

Latest stories

Related stories

UK Switches On First Commercial Deep Geothermal Power Plant

The UK’s first deep geothermal power plant has begun...

DOE Unveils $171.5M Push for Next-Gen Geothermal Field Tests

The U.S. Department of Energy (DOE) has announced a...

Thermal Energy Storage Strengthens Power System Planning

The integration of thermal energy storage into power system planning is providing a critical buffer for the electrical grid, enabling long-duration storage and enhancing the overall resilience and reliability of modern infrastructure.

Redesigning Power Systems for a Multi-Energy Future

The transition toward a multi-energy future necessitates a complete redesign of our power systems, moving away from isolated energy silos and toward an integrated, cross-sector architecture that maximizes efficiency and reliability.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »