Siemens Gamesa Will Build Pioneering 194-MW Wind Farm in Australia  

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Edge-Controlled Wind Farms Bringing Grid Stability

In the lookout for a sustainable energy future, wind...

The Road Forward for Decommissioning Offshore Wind

There is a construction boom, and this time around,...

Advancements in Hydropower: Innovations to Expect in 2025

As the global community struggles to address the immediacy...

 

Siemens Gamesa Renewable Energy (SGRE) has been commissioned to build a pioneering wind complex in Australia, which will combine the installation of a wind farm with 56 of the firm’s SG 3.4-132 turbines (for total capacity of 194 MW) with a battery energy storage system.

Under the terms of the contract entered into with the renewable energy IPP, Neoen, Siemens Gamesa will build the entire complex on an EPC basis and then maintain it for 25 years. Located in the Australian town of Stawell, in the state of Victoria, this hybrid facility – known as the Bulgana Green Energy Hub – will comprise a 194 MW wind farm as well as a 20 MW / 34 MWh lithium-ion (Li-ion) battery. EPC construction is set to begin right away and the commissioning of the facility is expected by August 2019.

It is worth highlighting the fact that this complex has already secured two power purchase agreements (PPAs): one with the government of the state of Victoria for the next 15 years; and the other with the Australian agribusiness Nectar Farms -who will use LED light technology to grow tomatoes in glasshouses- for the next 10 years.

Nectar Farms will also receive the power stored in the batteries during low wind periods. The energy supplied directly from the wind farm, at lower cost than available from the grid, helped its business case to proceed. It is estimated that 97% of this company’s needs will be supplied by 15% of all of the electricity generated at the wind plus storage facility, with the rest going directly to the local grid. Only 3 percent of Nectar Farms’ energy demand cannot be supplied with wind energy when longer no-wind-periods occur.

This is the fourth EPC contract undertaken by Siemens Gamesa for Neoen in Australia, for which it has already installed over 300 MW nationwide.

In addition to Australia, Siemens Gamesa’s presence in Asia Pacific extends to China, South Korea, Indonesia, the Philippines, Vietnam, Thailand, Japan and New Zealand. Overall it has installed over 6.6 GW on the continent, with a further 1.2 GW in the pipeline.

Latest stories

Related stories

Edge-Controlled Wind Farms Bringing Grid Stability

In the lookout for a sustainable energy future, wind...

The Road Forward for Decommissioning Offshore Wind

There is a construction boom, and this time around,...

Advancements in Hydropower: Innovations to Expect in 2025

As the global community struggles to address the immediacy...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back