Achema middle east

Enel commences operations at three wind farms in Romania

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Masdar, TotalEnergies Sign $2.2bn Renewable JV Deal in Asia

A $2.2bn agreement between Masdar and TotalEnergies has formalised...
- Advertisement -

Italian renewable energy company Enel Green Power has connected three wind farms in the Dobrogea region of Romania to the national grid thereby commencing commercial operations.

Comprising a total installed capacity of 206 MW, Elcomex EOL (Zephir I), Targusor (Zephir II) and Gebelesis wind farms, are expected to generate 560 million kWh a year at full production.

The Elcomex EOL wind farm features 52 turbines while the Targusor farm comprises 26 of them.

The Gebelesis wind farm employs five 3MW wind turbines and six 2MW wind turbines for a total installed capacity of 27 MW.

Enel invested a total of €340m for the construction of these wind farms that will expand its renewable power generation portfolio in Romania.

The Italian company currently has a fully operational installed wind capacity of 500MW in Romania.

Latest stories

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Masdar, TotalEnergies Sign $2.2bn Renewable JV Deal in Asia

A $2.2bn agreement between Masdar and TotalEnergies has formalised...

South Asia Clean Energy Transition Gains Regional Momentum

South Asia is undergoing a systemic transformation of its...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »