Green Marine Installs Penguin Wec At Emec

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Eight Energy Trends 2025: Redefining Global Energy Landscape

The Eight Energy Trends Defining 2025 The year 2025 is...

Ocean engineering firm Tadek delivers floating wind study for Marine Power Systems

The report assesses through-life performance of Tension Leg Platforms (TLP) compared...

Ensuring the integrity of underwater energy production equipment and related facilities

EEMUA has substantially upgraded its subsea engineering materials selection...

Wello Oy’s wave energy converter (WEC) has been successfully installed at the European Marine Energy Centre (EMEC) in Orkney as part of the CEFOW (Clean Energy from Ocean Waves) project.

The Penguin WEC was deployed at EMEC’s grid-connected wave test site at Billia Croo, off the west coast of Orkney, over the weekend.

This marks a welcome return to Orkney, with Wello having first tested at EMEC’s Billia Croo site in 2012.The installation was carried out by Green Marine, an Orkney based marine services provider.Jason Schofield, managing director of Green Marine, oversaw the operations:

“The successful installation of the Penguin at EMEC this weekend was due to careful planning and a close working relationship between Green Marine and Wello Oy,” he said.

“The fantastic operational planning by the Green Marine team, utilising the weather windows at this time of year, allowed for a seamless operation.”Funded by the European Commission’s research and innovation programme Horizon 2020, CEFOW is a five-year project led by Fortum to develop and prove Wello’s Penguin in real-sea conditions.

Mikko Muoniovaara, senior project manager at Fortum, added:
“Deploying the Penguin in winter is an important milestone for us, providing valuable learning for both Fortum and Wello. Cost efficiency of operations and maintenance plays an important role in any renewables and Green Marine’s achievement shows that these operations can be done safely outside the summer season if needed.”

Latest stories

Related stories

Eight Energy Trends 2025: Redefining Global Energy Landscape

The Eight Energy Trends Defining 2025 The year 2025 is...

Ocean engineering firm Tadek delivers floating wind study for Marine Power Systems

The report assesses through-life performance of Tension Leg Platforms (TLP) compared...

Ensuring the integrity of underwater energy production equipment and related facilities

EEMUA has substantially upgraded its subsea engineering materials selection...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back