Achema middle east

Goat Mountain Wind Ranch®

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Smart Safety Systems Enhancing Grid Workforce Protection

Integrating cutting-edge technology into traditional infrastructure, smart safety systems power transmission projects by providing an intelligent layer of protection that anticipates hazards before they manifest. These digital innovations are revolutionizing how utility companies manage risk, ensuring that every technician in the field is connected, monitored, and shielded by a data-driven safety net.

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Banpu US Expansion Drives $1.5bn Push into Gas Power Market

Thai energy group Banpu is preparing a significant expansion...
- Advertisement -

LOCATION: Coke & Sterling Counties, TX, approximately 30 miles north of San Angelo, TX

SIZE: 150 MW

COMMERCIAL OPERATIONS DATE:

PHASE 1: March 2008

PHASE 2: March 2009

UTILITY: ERCOT (Electric Reliability Council of Texas)

TURBINE EQUIPMENT: 80 Mitsubishi MHI 1000A / 29 Mitsubishi MHI 2400 2.4 MW

TRANSMISSION: 345 kV Transmission Line

INTERCONNECT: LCRA TSC

LAND: 20 landowners on 11,000 Acres.

CONTRACTOR: Wanzek Construction

DEVELOPER & MINORITY PARTNER: Cielo Wind Power

MAJORITY OWNER: Edison Mission Group (Irvine, CA)

HIGHLIGHTS:

  • Goat Mountain will be Edison Mission Group’s first wind project in the ERCOT market
  • Goat Mountain is Edison Mission Group’s second wind project in Texas
  • Edison Mission Group and Cielo Wind Power have jointly developed this site

 

Latest stories

Previous article
Next article

Related stories

Smart Safety Systems Enhancing Grid Workforce Protection

Integrating cutting-edge technology into traditional infrastructure, smart safety systems power transmission projects by providing an intelligent layer of protection that anticipates hazards before they manifest. These digital innovations are revolutionizing how utility companies manage risk, ensuring that every technician in the field is connected, monitored, and shielded by a data-driven safety net.

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Banpu US Expansion Drives $1.5bn Push into Gas Power Market

Thai energy group Banpu is preparing a significant expansion...

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »