SIZE: 1.32 MW
COMMERCIAL OPERATION DATE: March 2001
UTILITY: El Paso Electric
TURBINE EQUIPMENT: 2 Vestas V47 660kW
TRANSMISSION: 138 kV Transmission Line
INTERCONNECT: 15 MVA Substation
LAND: 1 Landowner on 5 Acres
CONTRACTOR: Virtus Construction
EPC CONTRACTOR, BOP MANAGEMENT, O&M PROVIDER: Cielo Wind
MAJORITY OWNER: El Paso Electric
HIGHLIGHTS:
- The first renewable facility certified as a Renewable Energy Credit Generator by the Public Utility Commission of Texas
- The produces approximately 4,000 Renewable Energy Credits (RECs) each year







![NextFloat Project Secures EIA Approval for Mediterranean Test Site Infographic about NextFloat Project securing EIA approval for a Mediterranean offshore test site, listing milestones and an 8.5 MW deployment.]](https://www.powerinfotoday.com/wp-content/uploads/2026/07/nextfloat-project-218x150.webp)