Close
MCE 2026
World Hydrogen & Carbon Americas

Liantang/Heung Yuen Wai Tunnelling Project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

India’s Clean Energy Expansion: Unlocking Sustainable Growth with Biomass Power

As India accelerates its transition away from fossil fuels,...

Renewsys Reel-Format Encapsulants Launched for Solar Modules

With the launch of Conserv Augmensheet sheet encapsulant, which...

Scatec Egypt Solar-Plus-Storage PPA Marks Major Milestone

Scatec ASA has signed a long-term power purchase agreement...
- Advertisement -

Liantang/Heung Yuen Wai Boundary Control Point and Site Formation and Infrastructure Works

– Contract 2

The project is one of the major construction contracts of a new cross-boundary connection in Hong Kong between the boundary control point near Heung Yuen Wai and Fanling Highway to provide a strategic and direct new transport link to serve the cross-boundary goods vehicles and passengers travelling between the northeast New Territories and Shenzhen East on Mainland China. Atkins is employed by Dragages (Hongkong) Limited to be the design consultant firm for the detailed design of a 4.8-km-long dual two-lane Lung Shan Tunnel excavated by tunnel boring machine (TBM) and Drill-&-Blast techniques, mid-ventilation adit, and temporary site formation at portals with other associated works.

One of the key challenges for Atkins is to carry out the detailed design of 12.5m ID TBM permanent lining for double tube tunnels in various ground conditions and form a numbers of underground cross passage openings with 6m span in soft ground underneath public area with shallow ground cover.

Latest stories

Related stories

India’s Clean Energy Expansion: Unlocking Sustainable Growth with Biomass Power

As India accelerates its transition away from fossil fuels,...

Renewsys Reel-Format Encapsulants Launched for Solar Modules

With the launch of Conserv Augmensheet sheet encapsulant, which...

Scatec Egypt Solar-Plus-Storage PPA Marks Major Milestone

Scatec ASA has signed a long-term power purchase agreement...

Oman Procures 1,600 MW of Solar, Wind Power Projects

Oman is going ahead and advancing its renewable energy...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »