Close
MCE 2026
World Hydrogen & Carbon Americas

Tecta Solar Installs 541.8-kWp Solar Photovoltaic System

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Digital Twins Transform Power System Operations

The implementation of virtual replicas for physical grid assets is revolutionizing maintenance and operational strategies, allowing utilities to simulate complex scenarios and optimize performance through high-fidelity data and predictive intelligence.
- Advertisement -
Tecta Solar, a division of Tecta America Corporation, recently completed the installation of a 541.8-kWp rooftop solar photovoltaic (PV) system for Shop Solar LLC in Whitinsville, Mass.

The system is projected to generate 627 MWh of energy in its first year of operation, which is equivalent to powering 86 average Massachusetts homes for a year. The system is installed on two rooftops in the building complex.

The solar professionals at Tecta Solar provided a turn-key solution for Shop Solar and managed the project from start to finish. Services included design, engineering, procurement, construction, SREC registration and commissioning of the roof-mounted project. Prior to the installation of the solar PV system, Tecta’s local roofing operating unit replaced the roofs.

“This installation is the first part of a two-phase project,” says Brett Chapman, Tecta Solar’s General Manager of New England. “Phase two is a 231-kWp system with Suntech polycrystalline modules and Uni-Solar thin-film laminates that will be finished by the end of the year.”

Tecta Solar installed the first commercial solar photovoltaic system to be qualified for the Massachusetts RPS Solar Carve-Out, a 142.6-kWp system that has been in operation for over a year.

Latest stories

Related stories

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Digital Twins Transform Power System Operations

The implementation of virtual replicas for physical grid assets is revolutionizing maintenance and operational strategies, allowing utilities to simulate complex scenarios and optimize performance through high-fidelity data and predictive intelligence.

Thermal Energy Storage Strengthens Power System Planning

The integration of thermal energy storage into power system planning is providing a critical buffer for the electrical grid, enabling long-duration storage and enhancing the overall resilience and reliability of modern infrastructure.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »