Events Date: 9

Elecnor wins its first contract in Colombia’s wind energy with the Guajira I wind farm

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...
- Advertisement -

The Spanish infrastructure, energy, services and telecommunications group Elecnor continues its expansion in the Latin American market, winning its first contract in Colombia. The project consists of the construction of the Guajira I wind farm with a capacity of 20 MW and an investment of 31.7 million euros. This park is located in the municipality of Uribia, an area of ??extraordinary wind resources located north of the department of La Guajira.

Elecnor assumes, within the EPC, all the engineering, onshore and offshore supplies and the integral construction of the park. The park will have 10 Vestas wind turbines measuring 78 meters in height and with a unit power of 2MW each, which will be connected to a lifting substation.

Guajira I is the second wind farm to be developed in Colombia after the construction of Jepírachi, which came into operation in April 2004. With this project, the Colombian government resumes its commitment to wind energy. Elecnor will develop the park for ISAGEN, a private energy generation and commercialization company, whose majority shareholder is BRE Colombia Hydro Investments Ltd.

Currently, the Elecnor Group has 1,744 megawatts (MW) of Renewable Energy in operation and construction. Furthermore, with the construction of this park, Elecnor continues to consolidate itself as a leading international company in turnkey projects through EPC (engineering, procurement and construction) contracts.

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...

UK Offshore Wind Strategy Pushes for 5 GW Annual Capacity

The United Kingdom must commission a minimum of 5...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »