Events Date: 9

Vestas introduces new larger-rotor, higher performing 3 MW turbine variant

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

Hitachi Energy to Deliver Automation for RWE Offshore Wind

Hitachi Energy has expanded its collaboration with RWE through...

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...
- Advertisement -

The V136-3.45 MW turbine increases energy output and reduces both levelised cost of energy and sound emissions in low-wind conditions.

The V136-3.45 MW turbine is the newest variant of the proven 3 MW platform, which Vestas continuously optimises to strengthen its product offerings. Raising the bar for low-wind site performance, the V136-3.45 MW combines Vestas’ largest onshore rotor diameter, the Vestas-patented Large Diameter Steel Tower technology, and our most advanced blade design to-date.  It enables Vestas to increase annual energy production by more than 10 percent compared to the V126-3.3 MW, while at the same time decreasing sound emission levels.

Anders Vedel, Executive Vice President for Technology and Service Solutions, says that “Combining advanced technology and the proven performance of the 3 MW platform enables the V136-3.45 MW to reduce the cost of energy even further. The bigger rotor, taller tower, and advanced aerofoil blade design make this new turbine variant ideal for low-wind sites, which comprise an increasingly important market segment in some countries.

The first V136-3.45 MW turbine is expected to be installed at the Østerild national test center for large turbines in northwestern Denmark during 2016. It is expected to be ready for serial production in the second half of 2017.

Latest stories

Related stories

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

Hitachi Energy to Deliver Automation for RWE Offshore Wind

Hitachi Energy has expanded its collaboration with RWE through...

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »