Close
MCE 2026
World Hydrogen & Carbon Americas

Vestas introduces new larger-rotor, higher performing 3 MW turbine variant

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Advanced Materials Boost Energy System Performance

The integration of advanced materials into the energy sector is fundamentally enhancing the performance, durability, and efficiency of power infrastructure, paving the way for a more resilient and sustainable energy future.
- Advertisement -

The V136-3.45 MW turbine increases energy output and reduces both levelised cost of energy and sound emissions in low-wind conditions.

The V136-3.45 MW turbine is the newest variant of the proven 3 MW platform, which Vestas continuously optimises to strengthen its product offerings. Raising the bar for low-wind site performance, the V136-3.45 MW combines Vestas’ largest onshore rotor diameter, the Vestas-patented Large Diameter Steel Tower technology, and our most advanced blade design to-date.  It enables Vestas to increase annual energy production by more than 10 percent compared to the V126-3.3 MW, while at the same time decreasing sound emission levels.

Anders Vedel, Executive Vice President for Technology and Service Solutions, says that “Combining advanced technology and the proven performance of the 3 MW platform enables the V136-3.45 MW to reduce the cost of energy even further. The bigger rotor, taller tower, and advanced aerofoil blade design make this new turbine variant ideal for low-wind sites, which comprise an increasingly important market segment in some countries.

The first V136-3.45 MW turbine is expected to be installed at the Østerild national test center for large turbines in northwestern Denmark during 2016. It is expected to be ready for serial production in the second half of 2017.

Latest stories

Related stories

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Advanced Materials Boost Energy System Performance

The integration of advanced materials into the energy sector is fundamentally enhancing the performance, durability, and efficiency of power infrastructure, paving the way for a more resilient and sustainable energy future.

India, UK Launch Offshore Wind Taskforce to Scale Capacity

India and the United Kingdom formally launched the India-UK...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »