Events Date: 9

GE to supply batteries for UK solar-storage project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Singapore to Expand Hydrogen-Ready Power Plants Capacity

Singapore is advancing its long-term power generation strategy with...

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

US Researchers Advance Solar Irradiance Forecasting Method

Researchers at Columbia University have introduced a new technique...
- Advertisement -

GE Renewable Energy has secured an agreement to deliver a 25MW energy storage system to be integrated with solar at a renewable energy park in the UK.

Wykes, the developer, chose GE to supply the system for its Chelveston Renewable Energy Park, which operates with 60MW of solar and 26MW of wind.

The wind farm features GEโ€™s 2.85MW onshore wind turbines. Wykes will use GEโ€™s Reservoir energy storage technology to add another 60MW of solar capacity to the facility.

The DC-coupled system will enable the PV array and batteries to share a common set of power conversion equipment, enhancing the overall energy output of the solar-storage hybrid system.

The configuration will optimise costs and increase the overall system reliability and flexibility, GE said. Chelveston represents the UKโ€™s first DC-coupled solar-storage plant in the UK.

Wykes engineering manager Scott Coleman said: โ€œAs part of our ongoing relationship with GE Renewable Energy, we selected their power storage system as it was flexible, scalable and allowed us to perform a range of tasks enabling us to provide resilient services, not only to the National Grid ESO, but to our private energy consumers within our expanding on-site Grid.โ€

GE Renewable Energy renewable hybrids CEO Prakash Chandra added: โ€œThe world is increasingly moving to generate more dispatchable renewables using Hybrid solutions โ€“ combining the power of standalone technologies like wind and solar with storage through controls and software, and, this project is a further demonstration of GEโ€™s capabilities in this space.

โ€œWe are proud to have been selected by Wykes to deliver this flagship project in the UK and for the opportunity to deliver on this challenging solution.โ€

Latest stories

Related stories

Singapore to Expand Hydrogen-Ready Power Plants Capacity

Singapore is advancing its long-term power generation strategy with...

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

US Researchers Advance Solar Irradiance Forecasting Method

Researchers at Columbia University have introduced a new technique...

SECI Issues Loan Tender for 700 MW Gujarat Solar Project

The Solar Energy Corporation of India (SECI) has initiated...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป