Events Date: 9

VINCI Construction to build Sambangalou dam in Senegal

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...
- Advertisement -

The €388 million Sambangalou dam contract follows on from an initial phase conducting studies and preparatory work, which took place over a period of 18 months.

The 91 m high dam will have a capacity of 128 MW, generating renewable energy, improving irrigation of farm land and supplying drinking water for surrounding districts.

The work will begin in the first half of 2021 and is scheduled to last 48 months. At its peak, the project will employ 1,000 people recruited and trained locally.

Moreover, once the Sambangalou dam project has been delivered, the drinking water treatment station set up for the project will be remain in operation. The worksite buildings will be donated to schools. Furthermore, engineers from the consortium will be involved in classes at the Kédougou technical high school.

The electricity generated by the dam will be injected into the grid of the four countries of the Gambia River Basin Development Organisation, where VINCI Energies is installing several hundred kilometres of high voltage lines.

The new contract is testament to the Group’s expertise in hydroelectric infrastructure and renewable energies to boost sustainable regional development.

*The consortium is composed of VINCI Construction Grands Projets, lead company, and VINCI Construction Terrassement, subsidiaries of VINCI Construction (75% of the consortium), and their partner Andritz, an Austrian turbine manufacturer, which (25% of the consortium).

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...

UK Offshore Wind Strategy Pushes for 5 GW Annual Capacity

The United Kingdom must commission a minimum of 5...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »