World Hydrogen & Carbon Americas

EDPR secures 25-year PPA for a 200 MWac solar project in the US

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

DOE Extends Craig Station Coal-Fired Power Plant Operation

The U.S. Department of Energy - U.S. DOE has...

China Connects Largest Open-Sea Solar Power Plant to Grid

China has gone ahead and completed the grid connection...

China Third-Generation Nuclear Power Technology Operational

Hualong One nuclear power base, which is apparently the...
- Advertisement -

EDPR continues improving its technological diversification and has now 2.5 GW of solar capacity secured to install until 2023.

EDP Renewables (Euronext: EDPR), the fourth largest renewable energy producer in the world, has secured a 25-year Power Purchase Agreement (“PPA”) to sell the green energy produced by a 200 MWac solar project in the US.

The solar project is located in Arizona and is expected to enter in operation in 2023. EDPR continues improving its technological diversification and has now 2.5 GW of solar capacity secured to install until 2023, which on top of the 0.6 GW already in operation, provides visibility on 3.1 GW of solar capacity by 2023.

EDPR’s success in securing new PPAs reinforces its low-risk profile and growth strategy based on the development of competitive projects with long-term visibility.

 

Latest stories

Related stories

DOE Extends Craig Station Coal-Fired Power Plant Operation

The U.S. Department of Energy - U.S. DOE has...

China Connects Largest Open-Sea Solar Power Plant to Grid

China has gone ahead and completed the grid connection...

China Third-Generation Nuclear Power Technology Operational

Hualong One nuclear power base, which is apparently the...

Vestas Awarded 390 MW Offshore Order in South Korea

Vestas has been awarded a 390 MW offshore order for...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »