Close
MCE 2026
World Hydrogen & Carbon Americas

Dubai to build UAE’s first wind farm

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...
- Advertisement -

DEWA has already identified the location for a wind farm and actual wind speed for a full year is currently being measured using a 150-metre metal tower.

Dubai has launched a project to study the feasibility of generating electricity by utilising wind energy in Hatta.

The project was launched Sheikh Mohammed bin Rashid Al Maktoum, Vice President, Prime Minister and Ruler of Dubai.

Based on field visits and available preliminary data on wind in Hatta, Dubai Electricity and Water Authority (DEWA) has identified the location for a wind farm with a total capacity of about 28MW.

Actual wind speed for a full year is currently being measured at the location using a 150-metre metal tower. The purpose is to collect accurate data and study the total capacity of the power plant as well as other technical details in terms of number of turbines, capacity of each, annual operating hours, among other things.

“At DEWA, our strategy and plans are guided by the vision and directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum to promote sustainability, innovation and the shift towards a green sustainable economy,” said Saeed Mohammed Al Tayer, MD & CEO of DEWA.

“The project to generate electricity using wind power is part of our efforts to diversify clean and renewable energy sources in Dubai. These include photovoltaic solar panels technology, Concentrated Solar Power (CSP), green hydrogen production using renewable energy, and pumped-storage technology in the hydroelectric power station in Hatta.”

 

Latest stories

Related stories

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »