Close
 World Hydrogen & Carbon Americas
ACHEMA MIDDLE EAST

MHI Vestas Offshore Wind wins record order for 450 MW Borkum Riffgrund 2 project in Germany

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Catalonia in Spain Approves Renewable Energy Decree

The parliament of Catalonia approved a renewable energy decree...

Hydro Tasmania Launches Tender for New Wind, Solar Players

In a recent move, Hydro Tasmania launches tender so...

3300 MW Offshore Wind Auction Launched by Philippines

The Government of the Philippines’s Department of Energy –...
- Advertisement -

DONG Energy has placed a milestone order with MHI Vestas Offshore Wind for the 450 MW Borkum Riffgrund 2 project in Germany.

The record breaking order is the largest ever for MHI Vestas, demonstrating the markets’ confidence in the V164-8.0 MW as well as underlining the strong relationship with DONG Energy.

MHI Vestas Offshore Wind has received a 450 MW order from DONG Energy for the Borkum Riffgrund 2 project in Germany. The order for V164-8.0 MW turbines includes a five-year full-scope service contract with an availability guarantee, ensuring optimised performance of the wind power plant with maximum power output. The V164-8.0 MW turbines – rated with a capacity of 8 MW will utilise MAX Power from the MVOW MAX Performance™ portfolio to be able to deliver a maximum output of 8.3 MW, further increasing the value for the customer.

MHI Vestas Offshore Wind is a joint venture between Vestas Wind Systems A/S (50 percent) and Mitsubishi Heavy Industries (MHI) (50 percent). The company’s sole focus is to design, manufacture, install and service wind turbines for the offshore wind industry.

The project will be delivered by MHI Vestas Offshore Wind and will not enter into the order backlog of Vestas Wind Systems A/S.

Latest stories

Related stories

Catalonia in Spain Approves Renewable Energy Decree

The parliament of Catalonia approved a renewable energy decree...

Hydro Tasmania Launches Tender for New Wind, Solar Players

In a recent move, Hydro Tasmania launches tender so...

3300 MW Offshore Wind Auction Launched by Philippines

The Government of the Philippines’s Department of Energy –...

Tenders Open for Three Major Offshore Wind Sites in Denmark

The Danish Energy Agency has opened a new round...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »