Close
Achema middle east
Horizon Clean Energy Expansion India Conference 2026

MHI Vestas Offshore Wind wins record order for 450 MW Borkum Riffgrund 2 project in Germany

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

NextFloat Project Secures EIA Approval for Mediterranean Test Site

The PlemCat test site, situated within the LEBA 1...

NEOWIND Initiative Launched to Support Offshore Energy Innovation in North East England

A new £4.5 million initiative, the NEOWIND funding programme,...

New Zealand Enacts Vital Offshore Wind Legislation to Secure Energy Future

The New Zealand Wind Energy Association (NZWEA) has formally...
- Advertisement -

DONG Energy has placed a milestone order with MHI Vestas Offshore Wind for the 450 MW Borkum Riffgrund 2 project in Germany.

The record breaking order is the largest ever for MHI Vestas, demonstrating the markets’ confidence in the V164-8.0 MW as well as underlining the strong relationship with DONG Energy.

MHI Vestas Offshore Wind has received a 450 MW order from DONG Energy for the Borkum Riffgrund 2 project in Germany. The order for V164-8.0 MW turbines includes a five-year full-scope service contract with an availability guarantee, ensuring optimised performance of the wind power plant with maximum power output. The V164-8.0 MW turbines – rated with a capacity of 8 MW will utilise MAX Power from the MVOW MAX Performance™ portfolio to be able to deliver a maximum output of 8.3 MW, further increasing the value for the customer.

MHI Vestas Offshore Wind is a joint venture between Vestas Wind Systems A/S (50 percent) and Mitsubishi Heavy Industries (MHI) (50 percent). The company’s sole focus is to design, manufacture, install and service wind turbines for the offshore wind industry.

The project will be delivered by MHI Vestas Offshore Wind and will not enter into the order backlog of Vestas Wind Systems A/S.

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

NextFloat Project Secures EIA Approval for Mediterranean Test Site

The PlemCat test site, situated within the LEBA 1...

NEOWIND Initiative Launched to Support Offshore Energy Innovation in North East England

A new £4.5 million initiative, the NEOWIND funding programme,...

New Zealand Enacts Vital Offshore Wind Legislation to Secure Energy Future

The New Zealand Wind Energy Association (NZWEA) has formally...

Nordex Group Finalizes Major Wind Turbine Supply Agreements in Germany

The Nordex Group has finalized new contracts with ENOVA...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »