NEL to establish high pressure multiphase flow facility in UK

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Trump Administration Keeps Eddystone Power Plant Running

As a precautionary measure against electricity shortages in the...

ADNOC Deepens Energy Partnerships with US Companies

  Strategic agreements announced during UAE-US business dialogue with...

The UK Can Get 50% Oil & Gas Locally from North Sea – OEUK

The UK still happens to hold quite a significant...

Algeria Aims Annual Natural Gas Production of 200 Billion M3

Algeria has gone on to make clear its energy...

UK-based flow measurement services provider NEL has agreed to set up a new high pressure multiphase flow facility at its Glasgow laboratories, with an investment of £500,000.

NEL said the facility, which will be the first in the UK, and replicate a wide range of multiphase flow conditions at high pressures of up to 60 bar, equivalent to a sea depth of 600 meters.

The company said that the new facility will help equipment vendors and operators for the development and verification of instruments for multiphase and wet gas flows.

In addition, the facility will help in identification of multiphase flow conditions at high pressures and enable oil and gas companies to reduce their capital and operating costs.

NEL director Dr Brian Millington said, “With worldwide oil reserves dwindling, the industry has increased subsea exploration to grow reserve volumes.”

“It is therefore vital that our new High Pressure Multiphase Flow Facility reproduces realistic subsea pressures to assure both equipment vendors and operators that their flow meters will function reliably once installed,” Millington added.

 

Latest stories

Related stories

Trump Administration Keeps Eddystone Power Plant Running

As a precautionary measure against electricity shortages in the...

ADNOC Deepens Energy Partnerships with US Companies

  Strategic agreements announced during UAE-US business dialogue with...

The UK Can Get 50% Oil & Gas Locally from North Sea – OEUK

The UK still happens to hold quite a significant...

Algeria Aims Annual Natural Gas Production of 200 Billion M3

Algeria has gone on to make clear its energy...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back