Gamesa Corporacion Tecnologies receives 460MW wind turbine projects in India

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Edge-Controlled Wind Farms Bringing Grid Stability

In the lookout for a sustainable energy future, wind...

The Road Forward for Decommissioning Offshore Wind

There is a construction boom, and this time around,...

Advancements in Hydropower: Innovations to Expect in 2025

As the global community struggles to address the immediacy...

 

 

The company has been contracted to install a total of 230 of its G97-2.0 MW class S and G114-2.0 MW class S turbines, custom-designed for the low wind speed sites typical of India

Gamesa continues to make solid inroads into the Indian market, reinforcing its leadership position with seven new orders1 for the supply of 460 MW in total to several customers.

The company will handle the turnkey construction of the most of the developments, as well as the supply, installation, commissioning and management of the operations and maintenance services of the facilities.

In all, Gamesa will supply 170 of its G114-2.0 class S turbines (340 MW) and 60 of its G97-2.0 MW class S (120 MW) turbines, both of which were specifically configured for the Indian market with the aim of maximising turbine performance at low wind speed sites. These projects are slated for commissioning during the first quarter of 2017.

Leadership position in India
These seven new projects reinforce Gamesa’s positioning in India, where the company ranked as the number-one OEM in 2015 for the third year in a row. According to the most recent ranking compiled by specialist consultancy MAKE, Gamesa increased its share of the Indian market from 25% in 2014 to 34% in 2015, further widening the gap with respect to the number two player. As for the market’s potential, MAKE is forecasting 30 GW of new wind power capacity additions in this market by 2025, driven the country’s growing energy requirement.

Gamesa has been present in India, where it has installed over 3,000 MW since 2009. In the first quarter of 2016, India accounted for 26% of the company’s total sales volume (in MW).

Latest stories

Related stories

Edge-Controlled Wind Farms Bringing Grid Stability

In the lookout for a sustainable energy future, wind...

The Road Forward for Decommissioning Offshore Wind

There is a construction boom, and this time around,...

Advancements in Hydropower: Innovations to Expect in 2025

As the global community struggles to address the immediacy...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back