ACHEMA MIDDLE EAST

Iberdrola completes Mexican nuclear power plant upgrades

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

China Encourages More Private Investment in Energy Projects

China is changing how it handles major energy and...

European Nuclear Consortium Launches Data4NuclearX Project

A consortium of six major European entities, EDF, CEA,...

UKAEA Launches Simulator for Tritium Fuel Cycle Training

The UK Atomic Energy Authority (UKAEA) is building on...

Cameco, Brookfield Signs Nuclear Reactor Deal with US Govt

Cameco Corporation announced that it has signed a binding...

Iberdrola Ingeniería has completed all upgrades at Mexico’s Laguna Verde Nuclear Power Station under a $605m project awarded in 2007.

With the latest upgrades, the generation capacity of the Laguna Verde nuclear power station on the coast of the Gulf of Mexico has increased to 1,640MW.

The company has replaced all equipment of units 1 and 2 with the latest generation of machines, thus enabling the nuclear power plant to operate at 120% efficiency.

Iberdrola also modified several components including main capacitor, steam separators, heating and air-conditioning, ventilation systems, auxiliary systems, and electrical systems at the plant.

The upgrade will extend the design lifetime of the Laguna Verde station, which is operated by the Mexican state-owned Comisión Federal de Electricidad (CFE). The plant is located in the Mexican state of Veracruz.

In 2007, the project was awarded to a consortium led by the Iberdrola subsidiary. Alstom Mexicana also participated in the project with 3% share.

Iberdrola supervised the design, engineering, equipment and material supply, installation, assembly, training, and testing for the project. The firm carried out the entire project during the scheduled refuelling stoppages.

 

Latest stories

Related stories

China Encourages More Private Investment in Energy Projects

China is changing how it handles major energy and...

European Nuclear Consortium Launches Data4NuclearX Project

A consortium of six major European entities, EDF, CEA,...

UKAEA Launches Simulator for Tritium Fuel Cycle Training

The UK Atomic Energy Authority (UKAEA) is building on...

Cameco, Brookfield Signs Nuclear Reactor Deal with US Govt

Cameco Corporation announced that it has signed a binding...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »