Events Date: 9

Greece Solar Plus Storage Auction Opens for 200 MW Round

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...
- Advertisement -

Greece has formally launched its first tender under the Apollo Program, with regulators opening the Greece solar plus storage auction for projects totaling up to 200 MW, alongside a separate 400 MW wind tender.

The auctions represent the first operational step of the Apollo Program since it entered into law in 2024. The initiative is designed to secure low-cost renewable electricity for low-income households and, in later phases, for municipalities and local authorities.

Under the Greece solar plus storage auction, bidders must submit project documentation and tariff offers at the same time through a single-round static process. The maximum eligible tariff has been set at โ‚ฌ80 per megawatt-hour for solar projects combined with storage, while wind bids will be capped at โ‚ฌ75 per megawatt-hour.

Winning projects will receive contracts for difference, with the awarded tariff functioning as the strike price. All selected assets must participate directly in the wholesale electricity market rather than operating under fixed feed-in schemes.

Applications must be filed by March 16. Eligible solar-plus-storage projects must already hold grid connection terms and an energy storage installation license, or provide a binding commitment to add storage capacity at a later stage.

Construction deadlines require photovoltaic and storage assets to be completed and grid-ready by December 31, 2027. The CfDs will run for 20 years from the date of grid connection and will apply only to electricity injected via the photovoltaic connection point, leaving battery revenues to be managed separately.

Auction conditions also impose a minimum oversubscription requirement of 40%, meaning bids must total at least 280 MW to allocate the full 200 MW. Participation must include at least three independently owned projects, with no single bidder permitted to secure more than 25% of the awarded capacity.

According to the government, this first phase of the Apollo Program will channel electricity at reduced tariffs to vulnerable households. A second phase, expected later this year, will focus on renewable projects supplying power directly to municipalities to lower public energy costs.

Power Info Today brings together the global energy industry โ€” from generation and transmission operators to utility executives and energy transition leaders โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

J&V Energy Expands Renewable Capacity with 187MW Solar Acquisition

J&V Energy Technology Co., Ltd. has officially reached an...

Fuel Storage Systems and Industrial Tank Infrastructure Management

Fuel storage systems are a foundational component of modern...

UK Offshore Wind Strategy Pushes for 5 GW Annual Capacity

The United Kingdom must commission a minimum of 5...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป