ACHEMA MIDDLE EAST

Chinas MingYang unveils country’s first floating offshore wind turbine

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

EIB loans €500 M to Iberdrola’s Windanker Offshore Wind Farm

The European Investment Bank (EIB) has finalized a €500...

Eneco to Acquire Business Energy Supplier Gulf Gas + Power

Eneco said it plans to acquire the business energy...

BASF Opens Green Hydrogen and Fuel Cell Facility in Germany

BASF Environmental Catalyst and Metal Solutions (ECMS) has inaugurated...

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

Chinese wind turbine manufacturer MingYang Smart Energy has launched the first floating offshore wind tower and turbine ever built in China, a 5.5MW turbine.

MingYang Smart Energy revealed the achievement in a LinkedIn post , announcing that the company’s MySE5.5MW typhoon-resistant floating wind turbine had begun rolling off its production line and a prototype had been constructed at MingYang’s Yangjiang manufacturing facility in the south of China.

The landmark achievement marks the first time a Chinese-made floating wind turbine prototype has been successfully installed.

Designed to meet the harsh environments common for the South China Sea region, including typhoons and extreme waves, the demonstration MySE5.5MW floating turbine will now be towed out to the site of China Three Gorges (CTG) 400 MW Yangxi Shapa III offshore wind farm.

MingYang has already been contracted to supply 31 of its ySE6.45-180 fixed-bottom wind turbines for the project, and is using its existing partnership to demonstrate the viability of its semi-submersible floating foundation and floating turbine.
The first 300 MW phase began delivering power at the end of November 2019, while phases 2 through 5 all entered construction simultaneously at the end of February 2020

China Three Gorges’ Yangxi Shapa offshore wind farm is divided into five phases of an eventual 1.7GW capacity.

Latest stories

Related stories

EIB loans €500 M to Iberdrola’s Windanker Offshore Wind Farm

The European Investment Bank (EIB) has finalized a €500...

Eneco to Acquire Business Energy Supplier Gulf Gas + Power

Eneco said it plans to acquire the business energy...

BASF Opens Green Hydrogen and Fuel Cell Facility in Germany

BASF Environmental Catalyst and Metal Solutions (ECMS) has inaugurated...

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »