Woodward Mountain Wind Ranch®

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Eleven South Wales Companies Selected for F4OR Programme

Eleven South Wales businesses have been chosen to join...

EU Invests in Kambarata-1 Hydropower Project in Central Asia

The European Union, along with its international partners, has...

UK Energy Firms Inject Green Hydrogen into Gas Grid in Trial

Energy companies have taken a big step for the...

Envision Energy Joins Kazakhstan’s First Wind Power Project

Envision Energy, a leader in green technology, has announced...

SIZE: 160 MW

COMMERCIAL OPERATIONS DATE: July 2001

UTILITY:TXU Energy

TURBINE EQUIPMENT: 242 Vestas V47 660KW turbines

TRANSMISSION: 2- 138 kV Substations, 7.3 mi.  Dual 138 kV and a 4.6 mi 138 kV Transmission Line

INTERCONNECT: 2 points, the 138 kV Rio Pecos and 16th circuit, and the 138 kV Rio Pecos and Ft.  Stockton Circuit, Texas-New Mexico Power (transmission facility operator) and West Texas Utilities

Company (transmission facility operator)

LAND: 50 landowners on 9,746 Acres

DEVELOPMENT & MINOR EPC: Texas Wind Power

MAJORITY OWNER: Florida Power and Light (FPL)

HIGHLIGHTS:

  • Largest project in the US at the time project was announced
  • One of the last major projects using one of the most successful turbine models ever produced in the wind turbine industry; the Vestas V47 turbine
  • Negotiated land rights for the project in competition with Enron. Cielo Wind Power was successful in negotiations over Enron due to their experience and excellent landowner relations

 

 

Latest stories

Related stories

Eleven South Wales Companies Selected for F4OR Programme

Eleven South Wales businesses have been chosen to join...

EU Invests in Kambarata-1 Hydropower Project in Central Asia

The European Union, along with its international partners, has...

UK Energy Firms Inject Green Hydrogen into Gas Grid in Trial

Energy companies have taken a big step for the...

Envision Energy Joins Kazakhstan’s First Wind Power Project

Envision Energy, a leader in green technology, has announced...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »