Close
MCE 2026
World Hydrogen & Carbon Americas

Woodward Mountain Wind Ranch®

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...
- Advertisement -

SIZE: 160 MW

COMMERCIAL OPERATIONS DATE: July 2001

UTILITY:TXU Energy

TURBINE EQUIPMENT: 242 Vestas V47 660KW turbines

TRANSMISSION: 2- 138 kV Substations, 7.3 mi.  Dual 138 kV and a 4.6 mi 138 kV Transmission Line

INTERCONNECT: 2 points, the 138 kV Rio Pecos and 16th circuit, and the 138 kV Rio Pecos and Ft.  Stockton Circuit, Texas-New Mexico Power (transmission facility operator) and West Texas Utilities

Company (transmission facility operator)

LAND: 50 landowners on 9,746 Acres

DEVELOPMENT & MINOR EPC: Texas Wind Power

MAJORITY OWNER: Florida Power and Light (FPL)

HIGHLIGHTS:

  • Largest project in the US at the time project was announced
  • One of the last major projects using one of the most successful turbine models ever produced in the wind turbine industry; the Vestas V47 turbine
  • Negotiated land rights for the project in competition with Enron. Cielo Wind Power was successful in negotiations over Enron due to their experience and excellent landowner relations

 

 

Latest stories

Related stories

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Digital Twins Transform Power System Operations

The implementation of virtual replicas for physical grid assets is revolutionizing maintenance and operational strategies, allowing utilities to simulate complex scenarios and optimize performance through high-fidelity data and predictive intelligence.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »