Close

Serbia signs agreement with Republika Srpska to build three hydroelectric power plants

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Air Liquide ELYgator Hydrogen Project in Rotterdam Launched

The Air Liquide ELYgator hydrogen project marks a big...

Finland Leads Clean Energy with world’s largest Sand Battery

Finland turned on the world's largest sand battery this...

Trinasolar Solaris Energy Partnership Powers Sri Lanka Solar

The Trinasolar Solaris Energy partnership brings together a global...

Scatec Solar Project South Africa Secures 846MW Capacity

The Department of Electricity and Energy (DEE) in South...

Serbian Prime Minister Ana Brnabic and Prime Minister of Republika Srpska Radovan Viskovic have signed a joint statement on the construction of three hydroelectric power plants in the upper Drina river basin, whose total value is €520 million (US$617.5 million).

The three hydroelectric power plants would form the future hydroelectric power system Upper Drina, and the first plant to be build would be 180-MW Buk Bijela. The other two hydropower projects to be developed were not named.

Brnabic said that Serbia and Republika Srpska have established a joint venture for the construction of the three power plants, in which public electric power company Elektroprivreda Srbije is the majority owner with 51% and the rest is owned by Elektroprivreda Republike Srpske.

This is the first of two strategic joint projects of Republika Srpska and Serbia for this and next year, she explained, and added that the second project involves the construction of an airport in Trebinje, Serbia, with the first flights expected in 2022.

The Prime Minister recalled that Serbia has invested €59 million (US$70 million) in various projects in Republika Srpska since 2014.

Viskovic said it would take six years to build the Buk Bijela hydroelectric power plant and that it would cost €200 million (US$237.5 million).

It is a green energy project that will enable economic growth of both Republika Srpska and Serbia, Viskovic said, and added that the power plants will be managed by a joint venture, thus avoiding complicated public procurement procedures.

Latest stories

Related stories

Air Liquide ELYgator Hydrogen Project in Rotterdam Launched

The Air Liquide ELYgator hydrogen project marks a big...

Finland Leads Clean Energy with world’s largest Sand Battery

Finland turned on the world's largest sand battery this...

Trinasolar Solaris Energy Partnership Powers Sri Lanka Solar

The Trinasolar Solaris Energy partnership brings together a global...

Scatec Solar Project South Africa Secures 846MW Capacity

The Department of Electricity and Energy (DEE) in South...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back