Close
MCE 2026
World Hydrogen & Carbon Americas

ETN awards $84m nuclear services contract to ÅF

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

France PPE3 Energy Plan Confirms Nuclear Expansion to 2035

France has formally published its third Multiannual Energy Programme...

Amentum Secures UK Nuclear Power Plants Contracts with EDF

Amentum, a US defence and engineering firm, announced on...

Rosatom on 3D Metal Printing in Kyrgyzstan Hydropower Sector

Rosatom, the Russian State Agency for Atomic Energy, has...
- Advertisement -

Electrobrás Termonuclear Electronuclear (ETN) has awarded a contract worth SEK 600m ($84.1m) to ÅF for the ANGRA 3 Nuclear Power Station in Brazil.

The ANGRA 3 Nuclear Power Station is located at the Central Nuclear Almirante Álvaro Alberto (CNAAA) in Angra dos Reis, Rio de Janeiro, and is administered by ETN.

The contract includes the 3D modelling of the piping, ventilation and electrical engineering design, technical support services and the as-built design for the nuclear island buildings of the nuclear power station. ÅF Finland will manage the project along with numerous local sub-contractors.

The company will start the project in the third quarter of 2012 and the project is expected to be completed in 2019.  ÅF group previously too won a contract worth SEK 100m ($14m) consulting services under the category of Owner’s Engineering Responsibilities for the construction of ETN’s third reactor at the CNAAA, which will be managed by ÅF Switzerland.

 

Latest stories

Related stories

France PPE3 Energy Plan Confirms Nuclear Expansion to 2035

France has formally published its third Multiannual Energy Programme...

Amentum Secures UK Nuclear Power Plants Contracts with EDF

Amentum, a US defence and engineering firm, announced on...

Rosatom on 3D Metal Printing in Kyrgyzstan Hydropower Sector

Rosatom, the Russian State Agency for Atomic Energy, has...

Duke Energy Enters Early Stages of Nuclear Development

Duke Energy has entered the early stages of nuclear...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »