Horizons Clean Energy Expansion Week

Victoria Grants Approval for USD 5 Billion Wind Farm Plan

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

DEME Wins Turbine Installation Contract for Zeevonk Project

DEME has secured a contract to transport and install...

Recurrent Energy Starts Up Villameca Solar Project

Recurrent Energy, a subsidiary of Canadian Solar Inc., has...

Uzbekistan Secures ADB Loan for Power Grid Modernisation

The Asian Development Bank (ADB) and Uzbekistan have signed...
- Advertisement -
Victoria has granted final state approval to WestWind Energy’s proposed Warracknabeal Energy Park, a wind farm planned to feature 219 turbines and attract more than USD 5 Billion in investment. The Victorian Government describes the Wimmera development as the largest wind farm in the Southern Hemisphere. The project still requires final approval from the federal environment minister.

State Approval Follows Environmental Assessment

Planning Minister Sonya Kilkenny approved the development five months after determining that its Environment Effects Statement (EES) identified acceptable environmental impacts. The decision follows a public exhibition of the EES in 2025 and two months of public hearings conducted by an independent inquiry panel.

Wind Farm to Feature 219 Turbines and Battery Storage

The USD 5 billion wind farm would cover approximately 26,000 hectares of farmland west of Warracknabeal and north of Horsham, more than 300 kilometres northwest of Melbourne. With generation capacity exceeding 1.5 gigawatts (GW), the facility would also include two battery energy storage systems rated at 300 megawatts each. The proposed investment would support the development of this large-scale renewable energy project.

Project Expected to Support Electricity Supply and Jobs

WestWind estimates that the development could supply around 12.5% of Victoria’s electricity demand, provide power equivalent to the needs of approximately 1.2 million homes and prevent more than 4.2 million tonnes of carbon emissions annually. Construction is expected to create about 950 jobs, while the developer has previously identified 35 permanent operational positions.

WestWind Highlights Project Milestone

WestWind Energy Managing Director Tobias Geiger said, “Today’s announcement is an important milestone for the Warracknabeal Energy Park and reflects a decade of detailed planning, technical assessment and engagement with the local community.”

He added, “Projects of this scale have the potential to make a substantial contribution to Victoria’s future energy supply, support regional economic development and attract further investment in renewable energy and associated infrastructure.”

Development Builds on Earlier Wind Farm Experience

The developer began consultations with local communities and landowners in 2017. The USD 5 billion wind farm is expected to marginally exceed the scale of Golden Plains Wind Farm, west of Geelong, which comprises 215 turbines and has a capacity of 1.33 GW. WestWind originated that project before selling its first stage to France-based TagEnergy, which achieved financial close in 2022.

Transmission Infrastructure to Connect the Project

Infrastructure plans for the USD 5 billion wind farm include approximately 34 kilometres of high-voltage overhead transmission lines, including a 13-kilometre connection to Murra Warra Terminal Station and the planned Western Renewables Link.

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Latest stories

Related stories

DEME Wins Turbine Installation Contract for Zeevonk Project

DEME has secured a contract to transport and install...

Recurrent Energy Starts Up Villameca Solar Project

Recurrent Energy, a subsidiary of Canadian Solar Inc., has...

Uzbekistan Secures ADB Loan for Power Grid Modernisation

The Asian Development Bank (ADB) and Uzbekistan have signed...

Russian Companies to Present Energy Solutions at African Energy Week 2026

Russian companies supported by the Russian Export Center (REC)...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »