Events Date: 9

Australia Selects 19 Renewable Energy Projects Under CIS

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

- Advertisement -

Australia’s Assistant Minister for Climate Change and Energy has confirmed the results of Tender 7 under the Capacity Investment Scheme. The latest procurement round selected 19 renewable energy projects, yielding a combined generation capacity of 7.8 GW. This volume successfully surpassed the initial tender target of 5 GW, driven largely by significant allocations in wind infrastructure across New South Wales, Queensland, Tasmania, South Australia, and Victoria.

Among the 19 successful bids, eight renewable energy projects integrate utility-scale generation with battery energy storage systems. These hybrid configurations will contribute more than 2.0 GW and 7.9 GWh of storage to the electrical grid. The remaining successful bids comprised a mix of solar and hybrid facilities located throughout New South Wales, Queensland, and Tasmania.

Wind developments represented a substantial portion of the newly awarded generation capacity. In New South Wales, authorized infrastructure includes the 346 MW Baldon Wind Farm, which features a 132 MWh battery energy storage component, alongside the 300 MW Bullawah Wind Farm Stage 1 and the 1,498 MW Yanco Delta Wind Farm.

Queensland’s approved infrastructure encompasses the 228 MW Banana Range Wind Farm, the 1,150 MW Bungaban Wind Energy Project equipped with a 1,400 MWh battery facility, and the 1,022 MW Theodore Wind Farm.

Further capacity allocations across the remaining states include:

  • Tasmania: The 341 MW Cellars Hill Wind Farm.
  • South Australia: The 289 MW Whyte Yarcowie Wind Farm.
  • Victoria: The 338 MW Willatook Wind Farm and the 72 MW Woolsthorpe Wind Farm.

The federal pipeline continues with upcoming rounds scheduled for the National Electricity Market. Tender 9, focusing specifically on National Electricity Market Generation, opens on 25 May with an indicative target of 5 GW. Bid submissions for this round will strictly close on 20 July 2026.

Simultaneously, the final outcomes for Tender 8, addressing dispatchable infrastructure, are projected for release in June 2026. The subsequent procurement phase under the Capacity Investment Scheme, identified as Tender 10 for dispatchable capacity, is also scheduled to launch in June 2026.

Power Info Today brings together the global energy industry โ€” from generation and transmission operators to utility executives and energy transition leaders โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป