Events Date: 9

TrustPower secures 35-year resource consent for 80MW Matahina Hydropower Scheme

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

Hydropower Digitalization: Turbine Upgrades & Efficiency

Hydropower has long been considered one of the most...

South Asia Clean Energy Transition Gains Regional Momentum

South Asia is undergoing a systemic transformation of its...

Industrial Water Energy Nexus in Power Intensive Processes

The industrial water energy nexus links water use and power demand, and managing it well can lift efficiency, reduce risk, and strengthen sustainability in power intensive processes.
- Advertisement -

New Zealand power developer TrustPower has secured a 35-year resource consent from the Environment Court to operate the 80MW Matahina Hydropower Scheme, located on the Rangitaiki River in the Bay of Plenty.

In granting the consent, the court imposed several conditions for TrustPower that include increasing monitoring activities and five-yearly reviews, besides an increase in financial contribution towards the river scheme and a one-off financial contribution to recover costs for the 2010-2011 floods.

The court has granted ramping rates (how fast downstream river levels are allowed to rise and fall), and multiple peaking (changes in downstream flow), but has rejected the company’s proposed low flow in the Rangitaiki.

TrustPower is required to work with the regional council’s Natural Hazards Group to pre-lower the dam further in advance of a significant flood that would increase floodwater storage in the dam, and reduce the flood peak downstream.

Regional Council general manager environmental management Eddie Grogan said that the resource consent conditions would address challenges related to impact on the environment, the Rangitaiki River Scheme, and flood protection.

ย 

Power Info Today brings together the global energy industry โ€” from generation and transmission operators to utility executives and energy transition leaders โ€” through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

Hydropower Digitalization: Turbine Upgrades & Efficiency

Hydropower has long been considered one of the most...

South Asia Clean Energy Transition Gains Regional Momentum

South Asia is undergoing a systemic transformation of its...

Industrial Water Energy Nexus in Power Intensive Processes

The industrial water energy nexus links water use and power demand, and managing it well can lift efficiency, reduce risk, and strengthen sustainability in power intensive processes.

Hydro Tasmania Launches Tender for New Wind, Solar Players

In a recent move, Hydro Tasmania launches tender so...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป