Close
MCE 2026
World Hydrogen & Carbon Americas

EDF to furlough Hinkley Point workers due to Covid-19

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Origis Gets $545mn For Texas Solar and Energy Storage Assets

Origis Energy, which is Miami-headquartered, has gone ahead and announced that it...

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...
- Advertisement -

Hinkley Point C has announced further steps (April 1) to ensure the safety of its remaining critical workers and the community during the Coronavirus pandemic. It follows a wide range of measures already put in place, including a very significant reduction in numbers on site. Today’s extra steps will help to limit contact between the site and the local community.

Non home-based site workers using local accommodation will now be housed at Hinkley Point C’s two Campus sites
Bus pick-up stops used by HPC workers in Bridgwater will no longer be used from Monday. All buses will instead collect and return passengers to our three secure park and ride locations where social distancing measures are being supervised. Pick-ups from village locations outside Bridgwater will be phased out as quickly as possible

Meanwhile existing measures remain in place:

Reduction of numbers from more than 4,000 to around 2,000 workers, allowing us to better enforce social distancing
Body temperature checks at site gates, plus thermal imaging cameras being installed
Extra buses to reduce the number of workers using each bus
Enhanced cleaning of buses, canteens, building handrails, door handles, desks, eating areas, welfare facilities and toilets.
Floor markers and changes to seating to distance canteen users from each other
Meeting rooms converted to additional areas available for breaks to give extra space

Hinkley Point C Delivery Director Nigel Cann, said: “The safety of the community we operate in and our remaining workers on site is of paramount importance. We are listening and adapting to feedback to help us improve wherever we can and we are closely following Government and Public Health England advice”

Latest stories

Related stories

Origis Gets $545mn For Texas Solar and Energy Storage Assets

Origis Energy, which is Miami-headquartered, has gone ahead and announced that it...

Qnity Electronics Acquires $61.5mn Advanced Facility

Qnity Electronics, Inc. has announced the acquisition of a new...

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

EU Industrial Accelerator Act Targets Solar, Battery Supply

The European Commission has unveiled a draft Industrial Accelerator...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »