Close
MCE 2026
World Hydrogen & Carbon Americas

ACCC plans to approve collective bargaining for Queensland coal producers

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

UK Switches On First Commercial Deep Geothermal Power Plant

The UK’s first deep geothermal power plant has begun...

DOE Unveils $171.5M Push for Next-Gen Geothermal Field Tests

The U.S. Department of Energy (DOE) has announced a...

Thermal Energy Storage Strengthens Power System Planning

The integration of thermal energy storage into power system planning is providing a critical buffer for the electrical grid, enabling long-duration storage and enhancing the overall resilience and reliability of modern infrastructure.
- Advertisement -

The Australian Competition and Consumer Commission (ACCC) has proposed to authorize collective bargaining for coal producers in Central Queensland to access Adani’s coal terminal and Aurizon’s rail network for coal transport.

ACCC released a draft determination to approve Endocoal, Whitehaven Coal, Yancoal Australia, QC Resource Investments and Linc Energy to collectively bargain with Adani Mining and Aurizon Network.

Adani Mining operates a new coal terminal at Dudgeon Point, while the Aurizon Network owns the rail infrastructure that connects collieries with the terminal.

ACCC Commissioner Joe Dimasi said that this decision allows coal miners to accomplish more timely and efficient negotiations to secure terminal and rail capacity, possibly reducing the risk of avoidable delays in the construction of this terminal and coal export growth.

“The ACCC is satisfied that the voluntary nature of the arrangements, the limited composition of the collective bargaining group and the limited scope of the negotiations means there is little, if any, public detriment,” Dimasi added.

The ACCC plans to grant authorization for a period of 15 years, which includes initial contract negotiations and possible long term contracts.

 

Latest stories

Related stories

UK Switches On First Commercial Deep Geothermal Power Plant

The UK’s first deep geothermal power plant has begun...

DOE Unveils $171.5M Push for Next-Gen Geothermal Field Tests

The U.S. Department of Energy (DOE) has announced a...

Thermal Energy Storage Strengthens Power System Planning

The integration of thermal energy storage into power system planning is providing a critical buffer for the electrical grid, enabling long-duration storage and enhancing the overall resilience and reliability of modern infrastructure.

Redesigning Power Systems for a Multi-Energy Future

The transition toward a multi-energy future necessitates a complete redesign of our power systems, moving away from isolated energy silos and toward an integrated, cross-sector architecture that maximizes efficiency and reliability.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »