Events Date: 9

SNAP-Benguet receives approval to operate Binga hydroelectric plant in Philippines

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Hydropower Market Growth Accelerates with Renewable Push

The global hydropower market is expected to expand from...

Statkraft Plans NOK 80 Billion Investment in Norwegian Hydropower Over Next Decade

Statkraft has announced updated investment estimates for Norwegian power...

Hydropower Digitalization: Turbine Upgrades & Efficiency

Hydropower has long been considered one of the most...
- Advertisement -

SN Aboitiz Power – Benguet (SNAP-Benguet), a subsidiary of Aboitiz Power, has secured certificate of compliance from the Energy Regulatory Commission (ERC) to operate all the four units of the upgraded 125.8MW Binga hydroelectric plant in Itogon, Benguet, Philippines. The consent is valid for five years.

Originally, the plant commenced commercial operations in 1960. Prior to rehabilitation, the plant has four Francis turbines of 25MW each with an annual production of about 350GWh.

The company upgraded capacity of each of the turbines at the plant, which 50 years of economic life, to over 30MW totaling to 125.8MW and now the plant’s annual production is estimated to be about 419GWh.

The scope of the upgradation works included construction of a new intake at higher elevation, new headrace, replacement and modernization of plant control system and replacement of electro-mechanical components.

As Binga is an operating plant, the company upgraded one unit at a time. The Binga plant, which forms part of the Ambuklao-Binga Hydroelectric Power Complex, was built four years after the Ambuklao plant for power generation and flood control.

 

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

Hydropower Market Growth Accelerates with Renewable Push

The global hydropower market is expected to expand from...

Statkraft Plans NOK 80 Billion Investment in Norwegian Hydropower Over Next Decade

Statkraft has announced updated investment estimates for Norwegian power...

Hydropower Digitalization: Turbine Upgrades & Efficiency

Hydropower has long been considered one of the most...

South Asia Clean Energy Transition Gains Regional Momentum

South Asia is undergoing a systemic transformation of its...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »