Achema middle east

Alstom Awarded Contract By BHEL For The 2×660 MW Banharpalli Coal Power Plant

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Geo Energy MBJ Integrated Infrastructure Hits 80% Completion

Geo Energy Resources Limited reported that its MBJ Integrated...

NextEra Energy 10 GW Gas Power Expansion Approved in U.S.

NextEra Energy has received approval from the U.S. president...

Substation Maintenance Strategies for Grid Reliability

Substation maintenance strategies improve grid reliability, reduce outages, and lower lifecycle costs through predictive tools and asset optimization practices.
- Advertisement -

Alstom has been awarded a contract by Bharat Heavy Electricals Limited (BHEL) worth close to €30 million[1] to supply components and services for the 2×660 MW Banharpalli Super Thermal Power Project (STPP) located in Jharsaguda, Orissa.

Under the scope of the contract, Alstom will co-operate with BHEL in designing the boilers and supply identified pressure parts of the 660 MW supercritical boilers, along with windboxes. It will also assist BHEL with technical advisors during the erection and commissioning of the units. Key components will be manufactured in Alstom’s manufacturing facilities in Concordia (USA), as well as in Durgapur (India). The units I & II are expected to be commissioned by 2018.

Commenting on this contract, Patrick Ledermann, Vice President of Alstom Thermal Power & Renewable Power in India, said, “We are pleased to win this contract for which we will provide our leading supercritical power plant solutions. Alstom’s supercritical boilers satisfy the most stringent environmental requirements and stand out for their robustness and high reliability. It also helps in achieving about 3-4% higher plant efficiency compared to conventional subcritical design.”

The new Banharpalli contract is a confirmation of the strong cooperation established since 2005 with BHEL. It comes in addition to contracts signed with BHEL between 2008 to 2014 for supercritical boilers in Barh II, Krishnapatnam, Bara, Yermaras, Bellary, Mouda, Nabinagar, Gadarwara, Suratgarh and most recently the Darlipalli and North Karanpura projects in India.

Latest stories

Related stories

Geo Energy MBJ Integrated Infrastructure Hits 80% Completion

Geo Energy Resources Limited reported that its MBJ Integrated...

NextEra Energy 10 GW Gas Power Expansion Approved in U.S.

NextEra Energy has received approval from the U.S. president...

Substation Maintenance Strategies for Grid Reliability

Substation maintenance strategies improve grid reliability, reduce outages, and lower lifecycle costs through predictive tools and asset optimization practices.

Grid Resilience Strengthened by Proactive Maintenance Models

Grid resilience is strengthened with proactive maintenance models that cut outages, enhance reliability, and support the long-term performance of substation assets.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »