Achema middle east

Hindhead bypass

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Smart Safety Systems Enhancing Grid Workforce Protection

Integrating cutting-edge technology into traditional infrastructure, smart safety systems power transmission projects by providing an intelligent layer of protection that anticipates hazards before they manifest. These digital innovations are revolutionizing how utility companies manage risk, ensuring that every technician in the field is connected, monitored, and shielded by a data-driven safety net.

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...
- Advertisement -

The A3 bypass at Hindhead was constructed to improve road safety, reduce congestion and improve air quality. Running beneath Devil’s Punch Bowl, a site of Special Scientific Interest, the new dual carriageway includes the longest non-estuary underpass in the UK – 1.83km of twin bored tunnels.

With traffic congestion now absent, the existing road south has been downgraded to a local distributor road, while the northern carriageway has been closed and restored to heathland, as it was a century ago.

The Highways Agency commissioned Atkins for design, geotechnical advice, site supervision, tender and contract documentation, noise and air quality assessments, and expert witness services.

 

Latest stories

Related stories

Smart Safety Systems Enhancing Grid Workforce Protection

Integrating cutting-edge technology into traditional infrastructure, smart safety systems power transmission projects by providing an intelligent layer of protection that anticipates hazards before they manifest. These digital innovations are revolutionizing how utility companies manage risk, ensuring that every technician in the field is connected, monitored, and shielded by a data-driven safety net.

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...

France Offshore Wind Tender Targets 10 Projects by 2027

France is preparing to launch one of its largest...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Translate »