Close

Bard Engineering installs Dell storage solution at offshore wind farms

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

SDIC Power Plans UK’s Largest Wind Turbines at Inch Cape

A Chinese state-owned enterprise is preparing to install the...

Envision Energy Unveils Smart Two-Blade Wind Turbine Design

China’s Envision Energy has achieved a major engineering milestone...

Canada Identifies First Four Offshore Wind Energy Areas

Canada has officially designated its first four offshore wind...

EU Approves €11B for French Offshore Wind Projects Expansion

The European Commission has cleared an €11 billion support...

German wind project developer Bard Engineering has installed a Dell storage solution to manage surging data volumes from the continuous monitoring and controlling of offshore wind farms.

With this new storage solution, the company now has a capacity of 120TB capacity, besides enabling automatic data accumulation as well as its calculation and analysis before moving it to archives.

Dell’s solution was deployed since amount of data collected from its wind turbines had grown significantly and the previous storage solution failed to tackle the automation requirements.

Bard Engineering IT head Andreas Fischer said that the company opted for Dell Compellent looking at its self-optimizing, intelligent storage functions.

“Combined with exceptional service and support throughout planning, implementation and operation phases, we benefit from a storage infrastructure that is proactively monitored by Dell and covered by a four hour on-site service support in the instance of any hard disk failure,” added Fischer.

Dell Germany storage sales director Andre Braun stated: “With advancements to the Dell storage and enterprise portfolio, an increasing number of customers are turning to our company for large-scale storage deployments.”

With Dell’s new solution, Bard Engineering can manage its growing data, alongside ensuring the long-term data can be economically archived in line with legal regulations that require a 20- to 25-year record of wind farm data.

 

 

Latest stories

Related stories

SDIC Power Plans UK’s Largest Wind Turbines at Inch Cape

A Chinese state-owned enterprise is preparing to install the...

Envision Energy Unveils Smart Two-Blade Wind Turbine Design

China’s Envision Energy has achieved a major engineering milestone...

Canada Identifies First Four Offshore Wind Energy Areas

Canada has officially designated its first four offshore wind...

EU Approves €11B for French Offshore Wind Projects Expansion

The European Commission has cleared an €11 billion support...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back