ACHEMA MIDDLE EAST

GE completes the first offshore wind turbine in France

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

EIB loans €500 M to Iberdrola’s Windanker Offshore Wind Farm

The European Investment Bank (EIB) has finalized a €500...

Eneco to Acquire Business Energy Supplier Gulf Gas + Power

Eneco said it plans to acquire the business energy...

BASF Opens Green Hydrogen and Fuel Cell Facility in Germany

BASF Environmental Catalyst and Metal Solutions (ECMS) has inaugurated...

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

GE has completed the installation of the first offshore wind turbine in France, at the Saint-Nazaire offshore wind farm. A further 79 Haliade 150-6MW wind turbines will be installed and commissioned by the end of 2022.

This project, led by EDF Renewables and its partners Enbrige and CPP, is the first commercial offshore wind farm in France.

“We are proud to celebrate this important moment for the French offshore wind sector in France together with EDF Renewables, Enbridge and CPP,” said Jan Kjaersgaard, President and CEO of GE’s Offshore Wind Business. “Although the first offshore wind turbine in France is already installed, it is actually the entire offshore wind industrial network in France that we must recognize and praise. Our teams, together with all partners involved, now remain focused on the safe installation of the next 79 wind turbines.”

Once operational, the farm will provide the equivalent of 20% of the electricity needs of the Loire-Atlantique region of France.

The nacelles for the 80 Haliade 150-6MW wind turbines were assembled at GE’s Saint-Nazaire manufacturing facility and the 73-meter blades were manufactured by LM Wind Power, a GE Renewable Energy company.

Latest stories

Related stories

EIB loans €500 M to Iberdrola’s Windanker Offshore Wind Farm

The European Investment Bank (EIB) has finalized a €500...

Eneco to Acquire Business Energy Supplier Gulf Gas + Power

Eneco said it plans to acquire the business energy...

BASF Opens Green Hydrogen and Fuel Cell Facility in Germany

BASF Environmental Catalyst and Metal Solutions (ECMS) has inaugurated...

Saudi Arabia Awards Renewable Energy Contracts Worth $2.4B

Saudi Arabia has signed renewable energy contracts exceeding 9...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »