Close
MCE 2026
World Hydrogen & Carbon Americas

MHI Vestas Offshore Wind wins record order for 450 MW Borkum Riffgrund 2 project in Germany

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Advanced Materials Boost Energy System Performance

The integration of advanced materials into the energy sector is fundamentally enhancing the performance, durability, and efficiency of power infrastructure, paving the way for a more resilient and sustainable energy future.
- Advertisement -

DONG Energy has placed a milestone order with MHI Vestas Offshore Wind for the 450 MW Borkum Riffgrund 2 project in Germany.

The record breaking order is the largest ever for MHI Vestas, demonstrating the markets’ confidence in the V164-8.0 MW as well as underlining the strong relationship with DONG Energy.

MHI Vestas Offshore Wind has received a 450 MW order from DONG Energy for the Borkum Riffgrund 2 project in Germany. The order for V164-8.0 MW turbines includes a five-year full-scope service contract with an availability guarantee, ensuring optimised performance of the wind power plant with maximum power output. The V164-8.0 MW turbines – rated with a capacity of 8 MW will utilise MAX Power from the MVOW MAX Performance™ portfolio to be able to deliver a maximum output of 8.3 MW, further increasing the value for the customer.

MHI Vestas Offshore Wind is a joint venture between Vestas Wind Systems A/S (50 percent) and Mitsubishi Heavy Industries (MHI) (50 percent). The company’s sole focus is to design, manufacture, install and service wind turbines for the offshore wind industry.

The project will be delivered by MHI Vestas Offshore Wind and will not enter into the order backlog of Vestas Wind Systems A/S.

Latest stories

Related stories

GE Vernova to Supply 17 Turbines for Italy Fortore Wind Farm

GE Vernova has been awarded a contract to provide...

Grid-Forming Technologies Strengthen System Stability

Advanced power electronics are redefining the electrical grid by enabling inverter-based resources to act as stabilizing nodes, ensuring frequency and voltage reliability in a world transitioning away from traditional synchronous generation.

Advanced Materials Boost Energy System Performance

The integration of advanced materials into the energy sector is fundamentally enhancing the performance, durability, and efficiency of power infrastructure, paving the way for a more resilient and sustainable energy future.

India, UK Launch Offshore Wind Taskforce to Scale Capacity

India and the United Kingdom formally launched the India-UK...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »