Close
Achema middle east
Horizon Clean Energy Expansion India Conference 2026

Siemens tech boosts energy efficiency in Alpine hut with advanced battery solution

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

US Regulator Pushes for Data Center Power Rules Overhaul

The Federal Energy Regulatory Commission (FERC) has directed major...

EBRD, EIB and EU to Fund Tunisia Solar Project Expansion

A €61.3 million financing package from the European Bank...

UK-Norway Offshore Wind Partnership Sealed with New MoU Deal

Two organisations at the forefront of the offshore wind...
- Advertisement -

The “Bergkristall” (Mountain Crystal), a mountain hut situated at an altitude of 2,883 meters in the Monte Rosa Massif of the Valais Alps, has been largely energy self-sufficient since 2010. Along with thermal solar collectors, a photovoltaic system integrated in the hut’s southern facade ensures a high degree of energy self-sufficiency and a reliable energy supply. Since 2010, all of the building’s performance data, such as solar energy generated and battery capacity, have been bundled in Siemens Navigator, the cloud-based building performance platform.

Lithium instead of lead
Ongoing analysis of the energy flows revealed that the lead batteries in use since the hut’s opening would soon reach the end of their life. This prompted the operators to put a new solution in place. Siemens was awarded the contract to design the entire solution and replace 48 lead batteries with 14 lithium iron phosphate (LFP) batteries with a capacity of 215 kWh. Thanks to regional airline Air Zermatt, approximately 8.6 tons of lead batteries were transported out and the nearly 2.7 tons of lithium batteries helicoptered in to the
Monte Rosa Hut. Following an initial trial with two batteries, technicians successfully connected the newly installed batteries to the energy supply system in just two days.

The new battery solution has pushed the hut’s energy self-sufficiency to even greater heights by lightening the load on the generator used in bad weather.

In addition, the new batteries offer more usable capacity. The completed project considerably boosts the Monte Rosa Hut’s secure, energy-efficient and sustainable energy supply at any time of day and in any weather condition.

Monte Rosa Hut: key figures

  • Opened in 1895 as Betemps Hut, renamed Monte Rosa Hut in 1940
  • Planning and development of a new “mountain hut of the future” by the Swiss Federal Institute of Technology (ETH) in Zurich
  • Opened in July 2010; old hut demolished in 2011
  • 120 beds, approximately 8,000 overnight stays per year
  • High degree of energy self-sufficiency, 215 kWh battery capacity
  • Waste water treatment and ventilation run autonomously, even in winter
  • All technical systems are digitalized and can be controlled remotely

Power Info Today brings together the global energy industry — from generation and transmission operators to utility executives and energy transition leaders — through trusted editorial, market intelligence, and digital engagement.

Our 2026 Media Pack offers integrated solutions to reach your audience:

  • Magazine & Digital Editions Showcase your brand within premium energy industry coverage read by executives and decision - makers worldwide.
  • Industry Insights & Reports Align with data - driven analysis, trend reports, and regional roundups across the global power and energy value chain.
  • Brand Authority & Credibility Position your company as a thought leader through expert commentary, interviews, and special features.

Latest stories

Related stories

US Regulator Pushes for Data Center Power Rules Overhaul

The Federal Energy Regulatory Commission (FERC) has directed major...

EBRD, EIB and EU to Fund Tunisia Solar Project Expansion

A €61.3 million financing package from the European Bank...

UK-Norway Offshore Wind Partnership Sealed with New MoU Deal

Two organisations at the forefront of the offshore wind...

1 million HVO operating hours at Gothenburg RoRo Terminal

In May 2026, Gothenburg RoRo Terminal passed one million...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »