Achema middle east

MHI Vestas finalises contracts for 589-MW Taiwanese offshore wind project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...

Banpu US Expansion Drives $1.5bn Push into Gas Power Market

Thai energy group Banpu is preparing a significant expansion...
- Advertisement -

MHI Vestas Offshore Wind said it has signed firm contracts with Copenhagen Infrastructure Partners (CIP) for the 589-MW Changfang and Xidao offshore wind complex in Taiwanese waters.

The joint venture (JV) between Denmark’s Vestas Wind Systems A/S (CPH:VWS) and Japan’s Mitsubishi Heavy Industries (TYO:7011) is to provide a total of 62 V174-9.5 MW turbines for the wind parks. This is the first project to reach financial close among those in the Asia-Pacific regions for which MHI Vestas will supply turbines.

The Danish fund management company, which is the majority shareholder in the projects, achieved financial close last week.

The two wind parks making up the complex will be built in several phases. Changfang Phase 1 will include 10 turbines with a combined capacity of 95 MW, to be erected in 2022. Changfang Phase 2, including 47 turbines with a total capacity of 446.5 MW and Xidao, consisting of five turbines with a capacity of 47.5 MW, will be installed the following year.

Latest stories

Related stories

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Zelestra, EDP Advance Solar Storage Retrofit at Pizarroso

Zelestra and EDP have signed an agreement introducing Spain’s...

Banpu US Expansion Drives $1.5bn Push into Gas Power Market

Thai energy group Banpu is preparing a significant expansion...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »