Close

Siemens Gamesa secures its largest ever wind turbine order of 300 MW in India

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Offshore Robotics Simulation Platform Boosts Wind Tech

The Offshore Renewable Energy (ORE) Catapult has developed a...

UK Extends CfD Renewable Energy Contracts to 20 Years

The UK government announced that it would extend the...

UK Unveils Onshore Wind Power Plan Targeting 29GW by 2030

The UK government is starting its first onshore wind...

Siemens Gamesa Renewable Energy’s positioning in India has received an important boost with this order, its largest ever in this market.

Under the terms of the EPC contract1 entered into with Sembcorp Green Infra Ltd., a 100% subsidiary of Sembcorp Energy India Ltd, Siemens Gamesa will build the 300 MW wind farm, at which it will install 143 of its SG 2.1-122 turbines, making it the largest single order secured by Siemens Gamesa in India.

Sembcorp Energy India Limited (SEIL) is a leading independent power producer with a successful track record of identifying, developing and operating power generation assets across the thermal and renewable power sectors in India. As of December 31, 2017, the company has a well-balanced and diversified portfolio of power assets, with an overall power generation capacity of approximately 4.37 GW spread across seven states.

Siemens Gamesa will provide all of the infrastructure needed to equip and operate the facility, located in Gujarat state, in western India. It will also maintain the facility, which is due to be commissioned in April 2019, for 10 years.

First order for the SG 2.1-122 turbine
The other milestone implied by this contract is the fact that it is the first order placed for the SG 2.1-122, a turbine specifically fine-tuned for low-speed sites such as those prevalent in India. The wind farm will be connected to India’s Interstate Transmission System and supply power to multiple states, helping them to meet their renewable energy requirement.

“This contract marks a landmark in Siemens Gamesa’s strategy in India on account of both the size of the project and the technology selected. Moreover, it sends a very positive signal regarding the market’s momentum and shores up our confidence in its full recovery”, underlined Ramesh Kymal, CEO of Siemens Gamesa’s onshore division in India.

Present in India since 2009, the accumulated base installed by Siemens Gamesa recently topped the 5 GW mark. The company has two blade factories in Nellore (Andhra Pradesh) and Halol (Gujarat), a nacelle factory in Mamandur (Chennai, Tamil Nadu) and a service centre in Red Hills (Chennai, Tamil Nadu).

1,Contract signed during the January-March period

Latest stories

Related stories

Offshore Robotics Simulation Platform Boosts Wind Tech

The Offshore Renewable Energy (ORE) Catapult has developed a...

UK Extends CfD Renewable Energy Contracts to 20 Years

The UK government announced that it would extend the...

UK Unveils Onshore Wind Power Plan Targeting 29GW by 2030

The UK government is starting its first onshore wind...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back