Close
Intersolar Summit Romania 2026
Horizons Clean Energy Expansion Week

Wind Energy

Vattenfall commits to landfill ban and to recycle all wind turbine blades by 2030

Vattenfall has set?ambitious?targets in how to deal with wind turbine blades at?end of life. An immediate commitment to a landfill ban on decommissioned wind turbine blades has been made. The next decade there will be an intense work increasing...

DNV awards Design Certification to the highest wind tower ever developed: Nabralift 2.0 HH190

Nabralift 2.0, the new family of Nabrawindยดs self-erecting tower (SET), has been awarded with the Design Evaluation Conformity Statement by DNV. Nabralift 2.0 portfolio consists in three different towers ranging from hub heights of 140 meters to 190 meters....

GE Renewable Energy launches second 107-meter wind turbine blade mold at its Cherbourg factory, France

The company will recruit and train 200 new employees, taking the siteโ€™s total workforce to 800. Additionally, GE Renewable Energy plans to expand the site with the construction of an additional hall for finishing blades. Cherbourg plant has established...

UL Wins Siemens Gamesa Contract to Certify Eind Turbines in the Onshore Wind Energy Industry

UL, the global safety science leader?and one of the worldโ€™s top testing, inspection and certification providers for renewable energy projects, has been awarded certification contracts by Siemens Gamesa Renewable Energy (SGRE) for the companyโ€™s most advanced turbine designs. Part...

RWE successfully completes onshore construction works for Triton Knoll Offshore Wind Farm

RWE has successfully completed all the major onshore electrical system construction works for Triton Knoll Offshore Wind Farm; this follows hot on the heels of the final Turbine. The works, which commenced in September 2018, involved laying 57km of 220kV...

Nabrawind introduces BladeRunner, a system that drastically reduces the cost of blade replacement and installation operations

The system is crane-free and can be used for blades up to 80 meters long BladeRunner, the new blade installation and de-installation system developed and patented by Nabrawind Technologies, reduces the cost of blade replacement by 70% compared to maintenance...

Collett & Sons Ltd Deliver Two 160Te Shunt Reactors for Neart na Gaoithe offshore wind farm project

Collett & Sons have transported two 160Te shunt reactors over 5000 miles, to the onshore substation site for the Neart na Gaoithe offshore wind farm project, jointly owned by EDF Renewables and ESB. Collett were contracted with the full scope...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Must read

Translate ยป