Events Date: 9

VSMC Awarded Eneco Luchterduinen Export Cable Installation Contract By Van Oord

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Related stories

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

Hitachi Energy to Deliver Automation for RWE Offshore Wind

Hitachi Energy has expanded its collaboration with RWE through...

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...
- Advertisement -

Cabling specialist VSMC, a joint VolkerWessels and Boskalis company has been awarded a contract by EPC contractor Van Oord Offshore Wind Projects ย bv to install and bury a 25km long export cable for the Eneco Luchterduinen Offshore Wind Farm.

North Sea

The Eneco Luchterduinen Offshore Wind Farm, to be built by Eneco and Mitsubishi Corporation, will be situated in the North Sea, 23 km off the coast, between Noordwijk and Zandvoort, the Netherlands. With 43 wind turbines in total, Luchterduinen will provide up to 150,000 Dutch homes with green energy.

CLV Ndurance

The project will be executed in September of this year using the in-house developed burial tool, the Trenchformer and the newly built cable-laying vessel, the Ndurance; designed for both shallow and deep water operations.

Latest stories

Related stories

US Offshore Wind: Trump Administration Pays Firms to Exit

Energy companies are recalibrating their investment strategies in response...

Hitachi Energy to Deliver Automation for RWE Offshore Wind

Hitachi Energy has expanded its collaboration with RWE through...

RWE Thor Wind Farm Adopts Recyclable Blades, Low-CO2 Towers

RWE has begun deploying an offshore wind turbine featuring...

Digital Tools Improving Safety in Transmission Projects

Transforming the way electricity is moved across continents, digital safety tools transmission projects are redefining the boundaries of workplace protection. By leveraging real-time data, mobile connectivity, and sophisticated imaging, utility companies can now manage complex high-voltage infrastructure with unprecedented visibility and a significantly reduced risk profile.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

โ€“ Access the Media Pack Now

โ€“ Book a Conference Call

โ€“ Leave Message for Us to Get Back

Translate ยป