Pan Asia confirms technical and financial viability for Indonesian coal project

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Trump Administration Keeps Eddystone Power Plant Running

As a precautionary measure against electricity shortages in the...

Eight Energy Trends 2025: Redefining Global Energy Landscape

The Eight Energy Trends Defining 2025 The year 2025 is...

Canadian Electricity and Cross-Border Energy Alliance

Power Play: Could Canadian Electricity Shape U.S. Trade Talks? How...

US Faces Dearth In Transformers That Help Power The Grid

The United States happens to be currently experiencing an...

Pan Asia Corporation has announced technical and financial feasibility of its Transcoal Minergy Underground Coal Mine Project in Indonesia following the completion of the base case feasibility study.

The study indicated that the total expenditure to develop the mine project is $179m. Based on the assessment of PT Kopex Mining Contractors, the project has a potential to deliver sellable coal of 1.5 million tones per annum over a 15 year period.

After drilling 55 boreholes vertically, minimum thickness of 0.20m coal is reported in the model while maximum thickness of parting included in seam thickness is 0.10m. Pan Asia chief executive officer Alan Hopkins said, “This is a major milestone for the Company with our flagship project receiving such a positive independent review”.

Exploration work, including infill drilling, currently underway, to the north will help refine the mine plan and could significantly extend the current mine life, the company said. Total sellable tonnes currently stands at 18 million tones but is expected to be about 22.5 million tones after current infill drilling.

 

Latest stories

Related stories

Trump Administration Keeps Eddystone Power Plant Running

As a precautionary measure against electricity shortages in the...

Eight Energy Trends 2025: Redefining Global Energy Landscape

The Eight Energy Trends Defining 2025 The year 2025 is...

Canadian Electricity and Cross-Border Energy Alliance

Power Play: Could Canadian Electricity Shape U.S. Trade Talks? How...

US Faces Dearth In Transformers That Help Power The Grid

The United States happens to be currently experiencing an...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back